CC Basic™ Inspection and Setup
5
Cat. No. 01021819
Close
Figure 2.
Position the ¼" tubing from the POU kit so that it exits from the rear of the cooler (Figure 3).
7.
Figure 3.
After installation of the POU kit, the RESET indicator should be located towards the rear of the unit (Figure 4).
8.