8
9
ASSEMBLY INSTRUCTIONS
ASSEMBLY INSTRUCTIONS
5.
THIS STEP REQUIRES 3 OR MORE
PEOPLE. DO NOT ATTEMPT ALONE.
EXTREMELY HEAVY.
a. Position the Top Lid and Burner Box
Assembly (A and B) onto the Cart Assembly
(C), as shown.
c. Assemble the front of the Burner Box
Assembly (A and B) to the Front Brace (CK),
as shown.
TIP:
One person should align the Front
Brace (CK) from inside the cart, while
the other person completes the
hardware assembly from the outside.
b. Assemble Burner Box Assembly (A and B)
the Left and Right Cart Side Panels (EA and
EB), as shown.
6
6
X 2
X 2
X 2
X 2
X 2
YOU WILL NEED:
YOU WILL NEED:
6.
Front, left side view
View under left side shelf
Back view, right side assembly
Front view
View under left side shelf
DA
BA
DB
1
5
3
6
4
A
B
B
C
b. Secure using hardware, as shown in figure B
and C.
a. Open the lid. Assemble the Left Side Shelf
(DA and DB) to the Cart Assembly by inserting
the Side Shelf tabs into the holes on the Cart
Assembly (figure A).
A
C
C
A+B
A+B
A+B
EB
EA
CK
6
6
X 4
X 2
X 4
X 2
X 4
X 2
YOU WILL NEED:
YOU WILL NEED:
1
2
3
3
4
4
DA
DA
BA
BA
DB
DB