15
e. Assemble the Infrared Zone Side Burner (DD)
to the Infrared Zone Support Frame (DC), at
the 2 points indicated in figure E.
14.
ASSEMBLY INSTRUCTIONS
d. Make sure that the Infrared Zone Side Burner
(DD) engages the Side Burner Valve (CC) gas
jet, as shown in figure D.
f. Feed the Infrared Zone Electrode wire (DE)
from underneath the Infrared Zone Side
Burner (DD), through the small opening on
the left side of the Infrared Zone Support
Frame (DC). Align and assemble the
electrode using the self tapping screw
provided, as shown in figure F.
g. Attach the Infrared Zone Lid (DG) to the Right
Side Shelf Table (DA), as shown.
F
G
D
E
DE
DC
DG
DD
DA
6
X 1
YOU WILL NEED:
13
6
6
X 2
X 2
X 2
X 2
X 2
X 2
YOU WILL NEED:
YOU WILL NEED:
6
7
9
7
11
8
Front, right side view
Front, right side view
CC
DD
DC
DD