C T I 2552 Installation and O peration G uide
7
CHAPTER 2. INSTALLATION
The installation of the 2552 Eight Channel RTD Input Module involves the following steps:
1. Planning the installation
2. Configuring the module
3. Inserting the module into the I/O base
4. Wiring the module input connector
5. Checking module operation
The steps listed above are explained in detail in the following pages.
2.1 Planning the Installation
Planning is the first step in the installation of the module. This involves calculating the I/O base power
budget and routing the input signal wiring to minimize noise. The following sections discuss these
important considerations.
2.2 Calculating the I/O Base Power Budget
The Model 2552 requires 2.8 watts of +5 V power from the I/O base. Use this figure to verify that the
base power supply capacity is not exceeded.
2.3 Unpacking the Module
Open the shipping carton and remove the special anti-static bag which contains the module.
Summary of Contents for 062-00108
Page 4: ...iv CTI 2552 Installation and Operation Guide ...
Page 6: ...vi CTI 2552 Installation and Operation Guide ...
Page 8: ...viii CTI 2552 Installation and Operation Guide ...
Page 10: ...x CTI 2552 Installation and Operation Guide ...
Page 13: ...CTI 2552 Installation and Operation Guide 3 Figure 3 Example Change Input Level ...
Page 16: ...6 CTI 2552 Installation and Operation Guide ...
Page 24: ...14 CTI 2552 Installation and Operation Guide CAUTION RTD wires must be of the same gauge ...
Page 28: ...18 CTI 2552 Installation and Operation Guide ...
Page 30: ...20 CTI 2552 Installation and Operation Guide ...
Page 34: ...24 CTI 2552 Installation and Operation Guide USER NOTES ...
Page 36: ...26 CTI 2552 Installation and Operation Guide ...