10 • EN
STEP 1 DESULFATION
Detects sulfated batteries. Pulsing current and voltage,
removes sulfate from the lead plates of the battery restoring
the battery capacity.
STEP 2 BULK
Charging with maximum current until approximately 80% bat-
tery capacity.
STEP 3 ABSORPTION
Charging with declining current to maximize up to 100% bat-
tery capacity.
STEP 4 ANALYSE
Tests if the battery can hold charge. Batteries that can not
hold charge may need to be replaced.
STEP 5 FLOAT
Maintaining the battery voltage at maximum level by provid-
ing a constant voltage charge.
STEP 6 PULSE
Maintaining the battery at 95–100% capacity. The charger
monitors the battery voltage and gives a pulse when neces-
sary to keep the battery fully charged.
READY TO USE
The table shows the estimated time for empty battery to 80%
charge
12V/0.8A
XS 0.8
BATTERY SIZE (AH)
TIME TO 80% CHARGED
2Ah
2h
8Ah
8h
20Ah
20h
32Ah
32h
20016572A US 0.8 NG, Manual, Print file 001.indd 10
2011-06-17 11:16:09