
Chapter 5. Loop Back and BERT Testing
100
November 2001
Data Port V.54 remote loop back
The Data Port V.54 remote loop back is performed by sending
standard V.54 loop back codes to the remote unit. The remote
unit then connects its local data channel receive data (RD) to the
channel transmit input (TD). This loop back test checks the
performance of the local
ETU-01A
, the remote
ETU-01A
and
the connections between them, as shown in Figured 5-8.
Figure 5-8. Data Port V.54 remote loop back
Integrated Bit Error Rate Test (BERT).
During
Data Port BERT
testing, the local DTE is disconnected
and the DSR line is off. An internal pattern generator connects a
user selected test pattern sequence to the transmit input of the local
data channel interface. To calibrate the system, the user can inject
errors at a selectable rate. The receive output is connected to a
pattern tester. The tester compares the received and transmitted
patterns and detects errors.
DTE
DSU
E1
CSU
LOCAL ETU-01A
DTE
DSU
CSU
REMOTE ETU-01A
Summary of Contents for ETU-01A
Page 1: ...INSTALLATION and OPERATIONMANUAL Version 2 0...
Page 2: ......
Page 4: ......
Page 24: ...Chapter 1 Introduction 18 November 2001 This page left blank intentionally...
Page 32: ...Chapter 2 Installation 26 November 2001 This page left blank intentionally...
Page 56: ...Chapter 4 Control Port Operation 50 November 2001 Figure 4 1 Example of terminal display...
Page 94: ...Chapter 4 Control Port Operation 88 November 2001 This page left blank intentionally...
Page 122: ...Chapter 6 SNMP Option 116 November 2001...
Page 139: ...NOTES 133 November 2001...
Page 140: ...NOTES 134 November 2001...
Page 143: ......