background image

 

 

SIGNATURE 2 SERIES 

           

3. Turn OFF main water supply and OPEN nearest faucet to relieve pressure.
4. Cut main line and install appropriate elbows and extensions. Inlet and outlet connections on the control valve are 3/4"   
    FNPT. (1" FNPT for RF30 and RF40.)

Caution: 

Raised arrows located on the sides of control valve body and bypass valve indicate proper direction of water  

 

   flow. Install inlet and outlet piping in direction of arrows.

- Drain Line Connection -

1. Pull out clip and remove drain line assembly located on the left side of control valve. Remove drain line hose barb and  
    wrap threads with Teflon tape. Reinstall drain line hose barb. 

Caution: Hand tighten only! 

 Replace drain line 

    assembly and reinstall clip.
2. Install 1/2” I.D. drain line tubing (not included) from hose barb to an open drain. A 4” gap between end of the drain line  
    and the open drain is required to prevent waste water backflow. Keep the drain line as short as possible. An overhead  
    drain line can be used if necessary, but should discharge below the control valve. A syphon trap (taped loop) at the  
    outlet of the drain line is advisable to keep the drain line full and assure correct flow during backwash. Elbows or other  
    fittings must be kept at a bare minimum.

Note:

 Where the drain line is elevated above the control valve or exceeds 20 feet in length, 3/4” I.D. drain line tubing  

          should be used. 

- Electrical Connection -

1. Connect the power supply to the control valve and plug into a 115 volt / 60 Hz receptacle.

Note: 

Do not plug into an outlet controlled by a wall switch or pull chain that could inadvertently be turned off.

 - Pressurizing The System -

2. Slowly rotate handle of the bypass valve to the SERVICE position. 
3. Open the nearest faucet to evacuate air from plumbing lines.
4. Check for leaks! If water is observed leaking from bypass, o-rings on valve body may not be seated properly. 
5. After air is evacuated from plumbing lines, turn off faucet.

- Initial Control Valve Operation -

1. Advance control valve to BACKWASH (cycle 1) position and allow water to run to drain for 3 to 4 minutes.

Warning:

 Close handle on bypass prior to selecting the backwash position. After backwash position has been 

 

    established, slightly open valve on bypass to evacuate air from the media tank. Fully open bypass valve  

 

    when all air is depleted. This procedure will prevent media form being uplifted into control valve.

2. Advance control valve to RAPID RINSE (cycle 3) position and allow water to run to drain for 3 to 4 minutes.
3. Advance control valve to SERVICE (cycle 0) position.

Installation

       
      6

         

Electronic Connections

 

         P - Power Supply

 

         B - Powered in Backwash Cycle Only

         S - Powered in Entire Regeneration Cycle

 P     B     S  

    

Summary of Contents for REACTR RF15

Page 1: ...SIGNATURE 2 SERIES Signature 2 Series Reactr Installation Operation Manual...

Page 2: ...ontrol Start Up Procedures Page 7 Utilizing Bluetooth Page 9 Master Programming Page 10 Powerhead Assembly Page 11 Valve Body Assembly Page 12 Manifold Breakdown Page 13 Bypass Assembly Page 14 Additi...

Page 3: ...bricant for all control valves Dow Corning 7 Release Compound is used in the manufacture of Chandler Systems control valves Part LT 150 Sealants Pipe dope and liquid thread sealers may contain a carri...

Page 4: ...area of direct sunlight or where freezing temperatures may occur See Installation Diagrams for proper placement and plumbing connections Installation 4 GROUNDED UNSWITCHED 115 VOLT OUTLET AIR INLET AI...

Page 5: ...sired location A Remove the control valve by unscrewing from the tank Do not fill through dome hole if installed B Use cap provided to place over top of distributor tube to prevent material from enter...

Page 6: ...te Where the drain line is elevated above the control valve or exceeds 20 feet in length 3 4 I D drain line tubing should be used Electrical Connection 1 Connect the power supply to the control valve...

Page 7: ...ver occur 3 Default setting is 6 days for filters 5 To Exit Main Menu press the Menu Enter button Note If no buttons are pressed for 60 seconds the Main Menu will be exited automatically 7 Control Sta...

Page 8: ...turn and finish the cycle where it left off prior to the power interruption When used without battery back up during a power failure the unit stops at its current point in the regeneration position an...

Page 9: ...If the valve device is a BTLE valve and it has a password other than the default password the first time you connect to it the app will ask you to enter the password After entering it the first time...

Page 10: ...ge the digits with the Set Change button and accept with the Menu Enter button After the entire display flashes press the Menu Enter button to move to the next menu item 2 Regeneration Cycle Step Time...

Page 11: ...Plate 20001X005 1 8 Lower Front Base For Cover 20111X002 1 9 Motor 20016X006 1 10 Lower Back Base for Cover 20111X003 1 11 Valve Cover 20111X000 1 12 Piston Screw 20001X003 1 13 Screw SC10 3 14 Screw...

Page 12: ...M PVC 20251X262 1 Flow Control Assy 6 0 GPM PVC 20251X263 1 Flow Control Assy 7 0 GPM PVC 20251X264 1 7 Drain Flow Fitting 90 Elbow 1 2 NPT X 1 2 20251X255 1 8 Drain Retainer 20001X214 1 9 O Ring Brin...

Page 13: ...OD x 1 4 ID x 12 VENT TUBE 1 12 65555X230 1 4 NPT PLASTIC PIPE PLUG 2 1 2 5 4 6 11 10 9 8 12 3 7 Ref Description Part Number Qty 0 Complete Manifold Assy w Float 65555X330 1 1 Screw 1 4 X 3 1 2 SS Ph...

Page 14: ...SIGNATURE 2 SERIES Bypass Assembly Ref Description Part Qty 1 Plastic Bypass Valve Assembly 20561X292 1 2 Bypass Valve 3 4 Stainless Steel 20561X270 1 Bypass Valve 1 Stainless Steel 20561X283 1 14 1 2...

Page 15: ...powerhead mounting screws The entire powerhead assembly will now lift off easily 4 Remove piston retaining plate screws 5 Pull upward on end of piston yoke until assembly is out of valve 6 Inspect th...

Page 16: ...lace pipline Pretreat to prevent Fouled media Clean media Pretreat to prevent Improper backwash setting Backwash more frequently 5 Continuous Flow to Drain Foreign material in control valve Call deale...

Page 17: ...______________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ _...

Page 18: ...ion resulting from abuse including freezing improper or negligent handling shipping by anyone If the unit has not always been operated within the factory calibrated temperature limits and at a water p...

Page 19: ...SIGNATURE 2 SERIES...

Page 20: ...SIGNATURE 2 SERIES CSI WATER TREATMENT SYSTEMS 710 Orange St Ashland OH 44805 l PH 419 281 6829 l FAX 419 281 2375 www csiwater com...

Reviews: