background image

 

                                                                                                                

                       

 

           

25

Service Instructions / Instructional Videos Available at www.csiwater.com

A. 

General Preliminary Instructions 

 

PERFORM BEFORE ALL SERVICING OPERATIONS

 

1. Turn off water supply to conditioner.

 

    -If the conditioner installation has a “three valve” bypass system, first open the valve in  the bypass line, then    

 

     close the valves at the conditioner inlet and outlet.

 

    -If the conditioner has an integral bypass valve, put it in the bypass position.

  

    -If there is only a shut off valve near the conditioner inlet, close it.

 

2. Remove cover and relieve water pressure in the conditioner by stepping the control into the backwash 

 

    position momentarily. Return the control to the service position.

 

3. Unplug electrical cord from outlet.

 

B. 

To Replace Powerhead

 

1. Remove the control valve cover and disconnect the power supply.

 

2. Disconnect the meter cable from circuit board and feed back through control (if existing meter is being re-used)

 

3. Remove lower back base screws and detach lower back base.

 

4. Remove screw and washer at drive yoke. Remove powerhead mounting screws. The entire powerhead 

 

    assembly will now lift off easily.

 

5. Put new powerhead on top of the valve. Be sure the drive pin on main gear engages slot in drive yoke (wide 

 

 

    side of drive yoke upright must face to the left away form the motor). 

 

6. Replace powerhead mounting screws. Replace screw and washer at drive yoke.

 

7. Reattach lower back base.

 

7. Reconnect meter signal, wire and power supply.

 

8. Reinstall cover.

C. 

To Replace Piston Assembly

 

1. Follow steps 

A1 - A3

 

2. Disconnect the meter signal wire from the circuit board.

 

3. Remove lower back base screws and detach lower back base.

 

4. Remove screw and washer at piston drive yoke. Remove powerhead mounting screws. The entire powerhead    

 

    assembly will now lift off easily.

 

5. Remove piston retaining plate screws.

 

6. Pull upward on end of piston yoke until assembly is out of valve.

 

7. Inspect the inside of the valve to make sure that there is no foreign matter that would interfere with the valve 

                 operation. 
 

8. Install new seals and spacers.

 

9. Take new piston assembly and push piston into valve by means of the end plug. Twist drive yoke carefully in a   

 

    clockwise direction to properly align it with drive gear. Reinstall piston retaining plate screws.

           10. Follow steps 

B5 - B9

D. 

To Replace Seals and Spacers

 

1. Follow steps 

A1 - A3

.

 

2. Disconnect the meter signal wire from the circuit board.

 

3. Remove screw and washer at piston drive yoke. Remove powerhead mounting screws. The entire powerhead    

     

    assembly will now lift off easily. Remove piston retaining plate screws. 

 

4. Pull upward on end of piston rod yoke until assembly is out of valve. Remove seals and spacers. (Note: Special  

 

    end spacer must be reused)

 

5. Lubricate new seals with silicone lubricant included in the seal and spacer kit. Make sure the special end  

 

    

    spacer is properly seated in the valve body. Install new seals and spacers individually, pressing around the  

 

    

    outer edge of each seal to make sure it is seated.  (When all seals and spacers are seated properly, you will    

  

    have a 1/4” of space between the top seal the the top of the valve body)

             6. Follow Steps 

C9 - C10

.

Summary of Contents for MS24-S2

Page 1: ...Signature 2 Signature 3 Softener Manual Installation Operation Manual...

Page 2: ...art Up Procedures Page 12 Master Programming Page 13 Utilizing Bluetooth Page 15 Control Valve Powerhead Assy Sig 2 Sig 3 Page 18 Valve Body Assembly Sig 2 Page 19 Bypass Assembly Sig 2 Page 21 Valve...

Page 3: ...rains Capacity Regeneration Lbs Salt Used 24 000 12 20 000 7 5 15 000 4 5 32 000 15 27 000 9 20 000 6 48 000 24 40 000 15 30 000 9 64 000 30 54 000 18 40 000 12 96 000 45 81 000 27 60 000 18 Maximum R...

Page 4: ...ft water The surfaces of these beads are covered with so dium ions As hard water enters the mineral tank and comes into contact with the resin an exchange of ions takes place as dissolved Calcium and...

Page 5: ...tallation Requirements A level floor position ahead of piping into water heater Unit must be installed at least 10 ahead of the inlet to a water heater to prevent damage due to back up of hot water DO...

Page 6: ...included All plumbing lines not requiring soft water should be connected upstream of the softener The brine tank drain line is gravity flow and must discharge below the overflow fitting The brine over...

Page 7: ...s and fill the mineral tank completely with water Replace the valve being careful to position the distributor tube into the distributor tube pilot hole Note If rebedding an existing unit and the syste...

Page 8: ...valve or exceeds 20 feet in length 3 4 I D drain line tubing should be used Brine Line and Overflow Connection 1 Position brine tank on a smooth level surface near the softener resin tank If necessary...

Page 9: ...uption When used without battery back up during a power failure the unit stops at its current point in the regeneration position and then restarts at that point when the power is restored The time wil...

Page 10: ...e Set Change button Example A To accept the digit value press the Menu Enter button Once A M or P M is accepted the next menu item will flash 4 To set Hardness an H will appear to enter Compensated Ha...

Page 11: ...ve step With Gallons Remaining Until Next Regeneration at 0000 Press and hold the Set Change button After 3 seconds the regeneration cycle will begin 3 To Fast Cycle thru regeneration First complete a...

Page 12: ...l valve to automatically fill the brine tank Note Control valve will advance to service position automatically Disinfection For disinfection of your unit please follow the Sani System Procedure on the...

Page 13: ...the scheduled time A setting of zero will cancel this feature Example Override every 7 days A 07 default setting or cancel setting A 00 Maximum is 29 3 Regeneration Cycle Step Times Steps 1 2 3 4 Exa...

Page 14: ...o be used for lawn sprinkling or other similar uses 2 Servicing the water softener 3 A water leak from the water softener is evident 4 Shock treating water well and piping with chlorine or other disin...

Page 15: ...the default password the first time you connect to it the app will ask you to enter the password After entering it the first time you should not need to enter it again unless it changes 3 BTLE Valve d...

Page 16: ...trol 1 Change Time of day Press set to set time automatically based on device time 1 Set Backwash Frequency 1 Set Regeneration Time This sets the amount of days between backwash cycles Example For 2am...

Page 17: ...uctions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If this equipment does cause harmful interfer...

Page 18: ...Softener Circuit Boad Assy 21001X102 1 2 Encoder 20001X124 1 3 Front Plate 20001X004 1 4 Encoder Wheel 20001X007 1 5 Main Gear 21001X120 1 6 Power Supply 20001X125 1 7 Back Plate 20001X005 1 8 Lower F...

Page 19: ...19 Valve Body Assembly Signature 2...

Page 20: ...1 4 End Spacer N S 1 5 Flow Control Button 1 2 GPM 20251X275 1 Flow Control Button 1 5 GPM 20251X266 1 Flow Control Button 2 0 GPM 20251X267 1 Flow Control Button 2 4 GPM 20251X268 1 Flow Control But...

Page 21: ...gnature 2 Ref Description Part Qty 1A Meter Assembly Turbine Complete 20003X200 1 1 Plastic Bypass Valve Assembly 20561X292 1 2 Bypass Valve 3 4 Stainless Steel 20561X270 1 Bypass Valve 1 Stainless St...

Page 22: ...22 2 9 1 3 13 14 12 16 17 18 19 21 22 10 11 4 5 6 7 6A 8 15 20 Valve Body Assembly Signature 3...

Page 23: ...017X258 1 Flow Control Assy 3 0 GPM PVC 20017X259 1 Flow Control Assy 3 5 GPM PVC 20017X260 1 6 Drain Line Flow Control Housing Blank 20017X100 1 7 Drain Line Hose Barb Straight 20017X255 1 8 DLFC Cli...

Page 24: ...1 Female Straight Slip Set optional 20017X288 3 1 NPT Elbow Set 20017X284 4 1 NPT Straight Set optional 20017X289 5a Elbow Vertical Adapter Blank optional 20017X295 5b Elbow Vertical Adapter 1 4 NPT T...

Page 25: ...over C To Replace Piston Assembly 1 Follow steps A1 A3 2 Disconnect the meter signal wire from the circuit board 3 Remove lower back base screws and detach lower back base 4 Remove screw and washer at...

Page 26: ...m front of circuit board 3 Unscrew meter assembly nut from valve body 4 Remove meter from valve body and clean or replace as necessary 5 Reinstall meter nut and cable G To Replace Brine Valve 1 Follow...

Page 27: ...over it Resin fouling Call dealer Find out how to confirm it Clean the resin and prevent future fouling Poor distribution channeling uneven bed surface Call dealer Check backwash flow Regenerate more...

Page 28: ...n line and or flow control button Injector and or screen is plugged Clean or replace injector and screen No water in brine tank Check for restriction in BLFC Ensure safety float is not stuck Check bri...

Page 29: ...ycle power to clear the error code Manually cycle the powerhead through the regeneration cycle steps to verify that the motor can cycle properly while the powerhead is disconnected from the valve body...

Page 30: ...g from abuse including freezing improper or negligent handling shipping by anyone If the unit has not always been operated within the factory calibrated temperature limits and at a water pressure not...

Page 31: ...31...

Page 32: ...32 CSI WATER TREATMENT SYSTEMS 710 Orange St Ashland OH 44805 l PH 419 281 6829 l FAX 419 281 2375 www csiwater com 11 17...

Reviews: