INSTALLATION & OPERATION MANUAL 10124 REV 0 (03/21)
PAGE
10
OF 20
G
as
F
ired
S
teamers
O
PERATION
CAUTION
If you smell gas during the lighting procedure, immediately shut off the gas supply until the leak has been corrected.
NOTICE
Do not attempt to operate this unit in the event of a power failure.
L
ighting
1. Ensure power, gas and water supply is on.
2. Turn power switch “ON”.
3. Steam generator tanks will begin filling with water.
4. Once proper water level has been reached, the ignition light will come on and should remain on.
5. Cooker is now ready for use.
Your steamer has been factory set, when “ON” to maintain water temperature during the READY phase at approximately
205º Fahrenheit (97º Celsius) just below water boiling point.
CAUTION
The appliance and its parts are hot. Use care when operating, cleaning and servicing the appliance.
CAUTION
Live steam and accumulated hot water in the compartment may be released when the door is opened.
CAUTION
An obstructed drain can cause personal injury or property damage.
WARNING
In the event of main burner ignition failure, a 5 minute purge period must be observed prior to re-establishing
ignition source.
WARNING
In the event you smell gas, shut down equipment at the main shut off valve and contact the local gas company or
gas supplier for service.
O
peration
Summary of Contents for GSX-10HE
Page 17: ...INSTALLATION OPERATION MANUAL 10124 REV 0 03 21 PAGE 17 OF20 Gas Fired Steamers Notes...
Page 18: ...INSTALLATION OPERATION MANUAL 10124 REV 0 03 21 PAGE 18 OF 20 Gas Fired Steamers Notes...
Page 19: ...INSTALLATION OPERATION MANUAL 10124 REV 0 03 21 PAGE 19 OF20 Gas Fired Steamers Notes...