ALL INSTALLATIONS AND OPERATIONS MUST FOLLOW FEDERAL, PROVINCIAL, STATE, AND LOCAL CODES FOR
WIRING, PLUMBING, INSTALLING CHIMNEY. ALL WORK MUST BE PERFORMED BY QUALIFIED PERSONAL ONLY.
It is recommended that piping used is able to withstand 100 PSI at 180 F, and is at least 1” (inch) in diameter. 1 1/4 “
(Inch) piping is recommended for larger systems.
The Crown Royal Stove shall be installed without interfering with the normal delivery of heated water from the
original boiler.
The Crown Royal Stove shall be installed without affecting the operation of the electrical and mechanical safety
controls of the original boiler.
The Crown Royal Stove shall provide a changeover from one fuel to the other without requiring manual adjustment of
any controls or components other than the thermostats.
The Crown Royal Stove shall have provisions for preventing, or adequate water capacity within the boiler to prevent
damage from loss of circulation due to electrical power failure.
The Crown Royal Stove shall be installed without changing the function of the controls or rewiring the original boiler.
A wiring interconnection is permitted. The electrical system of both boilers shall be powered from a single branch
circuit without exception.
FOR UNITS USED IN CANADA THE FOLLOWING IS RECOMMENDED:
1. Operate the existing boiler periodically to ensure that it will operate satisfactorily when needed.
2. Do not relocate or bypass and of the safety controls in the existing boiler installation.
3. The operation of the existing gas boiler must be verified for acceptable operation before and after installation of
the Crown Royal Stove by a gas fitter who is recognized by the regulatory authority.
4. Do not connect to any chimney or vent serving a gas appliance.
5. Ensure the installation complies with the requirements of CAN/CSA-B365. Any changes to the installation should
comply with CSA B139 (for oil-fire), C22.1 (for electric), or CAN/CGA-B149.1 or CAN/CGA-B149.2 (for gas-fired).