Crestron
CNX-ASBK
Audio Switcher Bussing Kit
Installing CNX-ASBKs into CNX-PAD8s
One CNX-ASBK is required for each CNX-PAD8 that is to be daisy-chained. The
only tools required are a Phillips tip screwdriver and a grounding strap. Follow the
assembly procedure and illustrations that begin after this paragraph.
CAUTION:
The CNX-PAD8s must be opened to install the CNX-ASBK. Observe
precautions for handling electrostatic sensitive devices (ESDs).
NOTE:
To daisy-chain CNX-PAD8s, all of the units must be stacked directly above
the other.
NOTE:
This procedure assumes that one CNX-PAD8 is already rack mounted in a
network system. If this is a totally new installation, start on step 7 of this procedure.
1. If the back panel of the CNX-PAD8 is accessible, remove the rack
mounting screws. If the back panel is NOT accessible, remove the
screws and pull CNX-PAD8 partially out of the rack to gain access.
2. At the rear of the CNX-PAD8, disconnect the electrical power (4-pin
Cresnet
power connector and/or the external power pack).
3. Note (or label) the position of each 6-pin RJ-11 network device cable
and disconnect.
4. Note (or label) the position of audio output, audio input loop-through,
and audio input RCA cables and disconnect each cable.
5. Remove the ground wire from the CNX-PAD8 ground screw.
Rear View of CNX-PAD8
CRESNET
POWER
ELECTRONICS INC. ROCKLEIGH, N.J. 07647
CRESTRON
2
RIGHT
LEFT
1
SOURCES
1 - 2
4
3
3 - 4
6
5
5 - 6
24
RIGHT
LEFT
G
8
7
7 - 8
ROOMS
3
2
1
7
6
5
4
Y
Z
G
CRESNET
24VDC
8
1A
AUDIO
INPUT
AUDIO
OUTPUT
EXTERNAL
POWER
PACK
GROUND
SCREW
AUDIO INPUT
LOOP-THROUGH
NETWORK
DEVICES
6. Remove the mounting ears from each side of the CNX-PAD8.
Remove the Mounting Ears
REMOVE THESE
(3) SCREWS
FROM EACH SIDE
Operations & Installation Guide - DOC. 8143
Audio Switcher Bussing Kit: CNX-ASBK
•
3