background image

The top panel and front panel are joined and should be removed as one assembly.  To do this, 

remove the screws fixing the rear flange of the top panel, and 

remove the two screws along the bottom edge of the front panel.  

Carefully  swing  out  bottom  of  front  panel  and  lift  assembly 

clear of casing, this operation also removes the control knobs 

under the flap.  Put assembly in a safe place to avoid damage 

to paint etc.

WALL FIXINGS - VERY IMPORTANT

5

A clear space of at least 3” (75mm) 

must  be  left  at  either  side  of  the 

heater,  and  any  projections  or 

shelves  must  be  at  least  10” 

(250mm) above the heater casing.  

Curtains must not be draped around 

or  in  contact  with  the  casing.    A 

shelf unit is separately available for 

fitting above heaters.

4

When bracket is securely fixed, replace 

the  heater  under  the  bracket  angle 

and  align  screw  holes  on  heaters 

ends.  There are two fixing slots at each end of 

heater,  allowing  different  stand-offs  for  different 

thicknesses of skirting board.  Do not fully tighten 

these screws until the bricks are loaded into the 

heater as some settling of the heater may occur.  

NOTE :  NEVER  REMOVE  THESE  SCREWS 

WITHOUT FIRST UNLOADING THE HEATER.

See  also  figure  1  regarding  carpets  where 

appropriate.

Note: Max. skirting size is 15 x 120mm.

Note that the smallest wall spacing should be used only when the skirting board is of the modern slim type, 

or there is no skirting board at all.  THE HEATER MUST STAND VERTICAL

3

You must fit a 
retaining screw at 
each end of the 
heater.

Summary of Contents for Newera TSR12AW

Page 1: ...ds EN60335 2 30 and the European Standard Electromagnetic Compatibility EMC EN55014 EN60555 2 and EN60555 3 These cover the essential requirements of EEC Directives 2006 95 EC and 2004 108 EC GDC Grou...

Page 2: ...avoid overheating do not cover the surfaces of the heater Do not put clothes fabrics or any other materials on the heaters Do not place objects in contact with the heater Do not position the heater w...

Page 3: ...of cleaning with vacuum cleaners etc underneath the heater Carpet gripper should be removed from behind the heater feet BRICKS The heater casing and the heater storage bricks with which it must be fit...

Page 4: ...on floor proper lay carpet over foot slitting it as shown it is unnecessary to cut carpet away Stand the heater against the wall in its intended position Mark the position of the two outside corners...

Page 5: ...ontact with the casing A shelf unit is separately available for fitting above heaters 4 When bracket is securely fixed replace the heater under the bracket angle and align screw holes on heaters ends...

Page 6: ...WITCHED ON ENSURE THAT ALL PACKAGING MATERIAL IS REMOVED FROM THE BRICKS BEFORE FITTING THEM MAINS TERMINALS IMPORTANT for earthing loosen the earth screw sufficiently to wrap the mains earth wire aro...

Page 7: ...front panel Temporarily remove one central element to provide access for the rear rank of bricks Loosen terminals on one of the elements and remove this to allow installation of rear rank of storage...

Page 8: ...NS WITH THE FLAT ON THE KNOB BOSS 12 13 SETTING THE CONTROLS The controls are located under the lockable flap at the right hand corner of the top panel To adjust the controls on the heater use a coin...

Reviews: