Page 4
©
Copyright 2006, Creative Playthings. Printed in U.S.A.
19718-300 Rev C (05-20)
7 Ft. Swing Beam
ASSEMBLY INSTRUCTIONS
STEP 2 – Swing Hangers
It is extremely important that you read and follow in installation
procedure provided in the Swing Hanger package. The Swing
Hangers should be mounted to the underside of the Swing
Beam Assembly in the positions shown.
In the case that a Spiral Slide Direct Adapter is attached to
the Gym, a Ring Trapeze should be mounted closest to the
Gym. The optional Glider should be mounted at the end of
the Swing Beam next to the legs.
STEP 3 – T-Bracket Assembly
Insert three T-Bracket Plugs into the open ends of the T-
Bracket.
Fasten two Beam Brackets the T-Bracket (E) using one 3/8
x 3" Hex Bolt, two 3/8" Flat Washers and one 3/8" Nylock
Nut each.
H/D Ny-Glide
Swing Hangers
Swing Beam Rail
Front View
H/D Ny-Glide
Swing Hanger
Lag Screws 3/8 x 3 1/2"
with 3/8 Flat Washers
Omit these hangers
on the Norfolk or
Manchester Gym
Omit these hangers if
installing optional Glider.
Gym
End
IMPORTANT: When mounting a Swing Beam to a
Norfolk or Manchester Gym. Do not install the two
swing hangers closest to the gym. The area must
be kept open for tire swing clearance.
STEP 4 – Install T-Bracket Assembly
Attach the T-Bracket Assembly to the Swing Beam using
one 3/8 x 5" Hex Bolt, two 3/8" Flat Washers and one 3/8"
Nylock Nut.
Beam Brackets
T-Bracket
T-Bracket Plug