Assembly
© Copyright 2010, Creative Playthings. Printed in U.S.A.
MODELS PS10CLATL & PTCLATL
19772-100 Rev L (03-19)
Page 8
ASSEMBLY INSTRUCTIONS
STEP 6 – Name Plate:
It is important to fasten the Playtime Name Plate (M) to the
Top Ladder. Federal law requires that the name of the manu-
facturer be permanently fastened to the gym, for identifica-
tion in case of warranty claim.
Center the nameplate on the forward facing surface of the
Top Ladder. Use the included #6 x 1/2" pan head screws
to attach the name plate to the Top Ladder. Make sure that
the screws are slightly loose. This will keep the nameplate
from bending due to temperature and moisture changes in
the wood.
STEP 7 – Ground Stakes:
Hammer Ground Stakes (H) into the ground 6 to 9 inches
from each end of each End Ladder Base Rail (B). Secure
each stake with two #8 x 2-1/2" Screws through the pre-
drilled holes.
Note: Do NOT use concrete to set Ground Stakes. Pound a
metal spike or rod into the ground to start a hole in hard or
rocky ground.
STEP 8 – Hang Swings:
Hang the Swings and Trapeze in the positions shown. Fol-
low the safety warnings included.
U.S. safety standards require a minimum clearance of 8"
from the bottom of each Swing Accessory to the ground.
U.K. (& E.U.) safety standards require a minimum clearance
of 350mm (13-3/4") between the bottom of each Swing Ac-
cessory and the ground.
The height of each Swing Accessory is adjusted by using a
different link in the chain. Be sure to hang the Swings Ac-
cessories with ground clearance greater than or equal to the
safety standard for your region.
1/8"
6"-9"
H
M
Center Line
47" to end of Top Ladder Rail
47" to end of Top Ladder Rail