Page 6
©
Copyright 2005, Creative Playthings. Printed in U.S.A.
19716-400 Rev C (11-20)
9 Ft. Swing Beam
ASSEMBLY INSTRUCTIONS
STEP 10 – Secure Legs to the T-Bracket
Fasten the Leg Assemblies to the T-Bracket Assembly using
two 3/8 x 4" Lag Screws and two 3/8" Flat Washers. (Drill 1/4"
diameter pilot holes in the Leg Assemblies for the Lag Screws).
Tighten the Hex Bolt Assembly that connects to the Angle
Brace.
STEP 11 – Secure the Beam Retainer
Replace the Hex Bolt Assembly removed in STEP 1 through
the top hole of the Beam Retainer, the Corner Post and the
Roof Rafter. Secure the bottom hole the Corner Post using one
3/8 x 3-1/2" Hex Bolt Assembly. Tighten all fasteners.
STEP 12 – Install Gym Base Extension
(Not required for Ridgefield, Yorktown, Manchester or
Norfolk gyms).
Remove the Hex Bolt Assemblies on the Bottom Side Base
Support. Locate the Base Rail Anchor (E) and the Gym Base
Extension (C).
Fasten the Base Rail Anchor to the outside of the Bottom Side
Base Support through the Corner Post using two 5/16 x 5-1/2"
Hex Bolt Assemblies, as shown. Fasten the Gym Base
Extension to the Base Rail Anchor using two 5/16 x 2" Hex Bolt
Assemblies.
C
E
Hex Bolt
3/8 x 3-1/2"