pg 17 of 48
REF: VOY122 - QUARTER MASTER
Installation Instructions
Instructions will be split between:
BOW / ENTRY (Open Front) / MAIN DECK / STERN
SECTION 1 - BOW ASSEMBLY
Position the BOW PANELS - Starboard / Portside
DRY INSTALL - Do not concrete posts until the full assembly is complete
Ensure
The PANELS are positioned 30mm above
FINISHED GROUND LEVEL
1
FGL