pg 12 of 49
REF: VOY118 - PIRATE SHIP MIDI (TIMBER)
FOUNDATION Details
Notes:
1) DATUM LINE and DATUM POSTS
Foundation measurements will be taken from the DATUM LINE and DATUM POSTS - this is labelled as DL
2) GROUND LEVEL
All measurements for DEPTHS and HEIGHTS are taken from FINISHED GROUND LEVEL - this is labelled as FGL
3) SLIDE OUTLINES
The slide ‘OUTLINE’ has been included to help highlight the orientation of the area
4) DIRECTION OF HOLES
Ensure the PRE DRILLED HOLES are positioned as shown - Dashed lines show holes going in the opposite direction
A
J
DATUM LINE
VOY118
VOY118
A
J
VOY118
VOY118