background image

REF: AT16 - ADVENTURE TRAIL 16

 pg 21 of 29 15.04.2019

ATTACH TYRE CHAINS

INSTALLATION INSTRUCTIONS

19

20

ATTACH TIMBER H11 TO WEAVING POST UPRIGHTS 

USING 274.M12X180 & 200 / 656.M12 / 102003-01 

USING M12 X 50MM SOCKET NUT ON EYEBOLT CHAINS & D- SHACKLE SETS ON MIDDLE CHAINS

NOTES:

REPEAT EYEBOLT CHAIN ON 

BOTH SIDES

ATTACH MIDDLE CHAINS TO 

TYRES AS SHOWN

ENSURE CHAIN IS POSITION 

ON INSIDE OF D - RING

REMOVE LINKS IF 

NECESSARY

H11

Summary of Contents for ADVENTURE TRAIL 16

Page 1: ...REF AT16 ADVENTURE TRAIL 16 pg 1 of 29 15 04 2019 AT16 ADVENTURE TRAIL 16 Installation Instructions...

Page 2: ...UPRIGHT TIMBER AT U4 3000 1 UPRIGHT TIMBER AT U5 3000 1 UPRIGHT TIMBER AT U6 2335 1 END CAP UPRIGHT TIMBER AT U7 3000 4 UPRIGHT TIMBER AT U8 1800 2 END CAP UPRIGHT TIMBER AT U9 2100 1 END CAP UPRIGHT...

Page 3: ...GRIP SLAT AT H8 900 2 END CAP END CAP HORIZONTAL TIMBER HEXA GRIP SLAT AT H9 900 2 PLAYTEC L S PLAYTEC L S HORIZONTAL TIMBER AT H10 2100 1 END CAP END CAP HORIZONTAL TIMBER AT H11 2010 1 END CAP END C...

Page 4: ...L 16 pg 4 of 29 15 04 2019 x1 x1 TRAVERSE ROPE 1 ROPE BRIDGE SWINGING ROPE CHAIN CLIMBING PANELS LOWER SWINGING ROPES CLIMBING PANELS UPPER x73 x6 x79 656 M12 656 M10 102003 01 M12 x15 274 M12X200 x2...

Page 5: ...16 pg 5 of 29 15 04 2019 PARTS REQUIRED x2 CONSISTS OF SHACKLE BOLT NYLOC CAP 349 742 D SHACKLE SET 274 M12X180 x8 x2 x2 x61 274 M12X220 M12 SOCKET NUT 50MM 97 M8X80CSK x1 x2 x2 780MM TYRE CHAIN 660MM...

Page 6: ...F AT16 ADVENTURE TRAIL 16 pg 6 of 29 15 04 2019 PARTS REQUIRED x5 PLAYTEC T SETS x1 LOG WALK PRE ASSEMBLED ROPE TRAVERSE 2 x1 x2 STEPPING LOG UA4 x1 STEPPING LOG UA6 x2 x2 STEPPING LOG UA5 x1 TUNNEL N...

Page 7: ...REF AT16 ADVENTURE TRAIL 16 pg 7 of 29 15 04 2019 x2 x2 274 M12X230 274 M12X110...

Page 8: ...x1 x1 SET TRAVERSE ROPE 3 CHAIN PLAYTEC UNDER BRACKET x1 TRAVERSE ROPE 3 x2 TIMBER CLIMBING PANEL UPPER CARGO NET x1 x2 TIMBER CLIMBING PANEL LOWER x1 PRE ASSEMBLED TUNNEL PANEL x1 PRE ASSEMBLED TUNNE...

Page 9: ...REF AT16 ADVENTURE TRAIL 16 pg 9 of 29 15 04 2019 FOUNDATION DETAILS U2 U3 U4 U5 U6 U7 U7 U8 U8 U9 U10 U12 U11 U12 U13 U14 U15 U13 UA1 UA2 UA3 UA1b UA5 UA4 UA6 UA5 UA6 U1 U1 U1 U1 FOUNDATION DETAILS...

Page 10: ...REF AT16 ADVENTURE TRAIL 16 pg 10 of 29 15 04 2019 FOUNDATION DETAILS U1 U1 U1 U1 U2 U3 U4 U5 U6 U7 CONCRETE POST FGL SOIL U7 U8 U8 U9 U10 U12 U11 U12 U12 UA1 UA2 UA4 UA3 UA5 UA3 UA4...

Page 11: ...ADVENTURE TRAIL 16 pg 11 of 29 15 04 2019 SURFACING DETAILS MINIMUM SPACE OVERALL AREA DP DATUM POINT 0 0 X Y 1055mm 1055mm Y axis dimensions will be shown HORIZONTAL X axis dimensions will be shown...

Page 12: ...HE UPRIGHT TIMBERS USING 274 M12X200 656 M12 102003 01 SECURE HEXBOARD WITH M8X80MM WOOD SCREWS FOLLOWING FOUNDATION DETAILS H1 U1 AT U2 AT U3 AT U4 AT U5 AT U6 AT U7 AT U8 AT U9 AT U10 AT U11 AT U12...

Page 13: ...19 INSTALLATION INSTRUCTIONS 3 4 ATTACH TIMBER H3 ATTACH H2 TIMBERS USING PLAYTEC L S USING 274 M12X200 656 M12 102003 01 USING M8X80MM WOOD SCREWS TAKE CARE THAT SCREWS DO NOT CROSS H2 H2 H3 NOTES H3...

Page 14: ...H TIMBER H4 AND LOWER PLAYTEC CLIMBING PANEL SHOWN ATTACH ROPE BRIDGE USING 274 M12X180 220 656 M12 102003 01 AND M8X80MM WOOD SCREWS USING 656 M12 102003 01 H4 NOTES ATTACH PANEL ON OPPOSITE FACE TO...

Page 15: ...TIONS 7 8 ATTACH REMAINING 3 PLAYTEC CLIMBING PANELS ATTACH H3 HEXBOARD SLAT USING 8X80MM WOOD SCREWS USING 8X80MM WOOD SCREWS TO COVER COUNTERSUNK BOLT NOTES THIS PANEL IS ALREADY ATTACHED AS PER STE...

Page 16: ...F AT16 ADVENTURE TRAIL 16 pg 16 of 29 15 04 2019 INSTALLATION INSTRUCTIONS 9 10 ATTACH SWINGING ROPES TO TIMBER H5 ATTACH TIMBER H5 USING PLAYTEC L S USING 656 M12 102003 01 USING 8X80MM WOOD SCREWS H...

Page 17: ...16 pg 17 of 29 15 04 2019 INSTALLATION INSTRUCTIONS 11 ATTACH TIMBER H6 ATTACH SWINGING ROPE CHAIN USING 274 M12X200 656 M12 102003 01 USING M12 X 50MM SOCKET NUT D SHACKLE AND EYEBOLT SHOULD BE PRE...

Page 18: ...f 29 15 04 2019 ATTACH TRAVERSE ROPE ABOVER TIMBER H6 INSTALLATION INSTRUCTIONS 13 14 ATTACH H8 TIMBERS USING 274 M12X200 656 M12 102003 01 USING 656 M12 102003 01 H6 H6 H8 H8 NOTES H8 HEXBOARD SLATS...

Page 19: ...ADVENTURE TRAIL 16 pg 19 of 29 15 04 2019 ATTACH TIMBER H7 INSTALLATION INSTRUCTIONS 15 16 ATTACH H9 TIMBERS USING PLAYTEC L S USING 8X80MM WOOD SCREWS USING 274 M12X180 200 656 M12 102003 01 H8 H8 H7...

Page 20: ...REF AT16 ADVENTURE TRAIL 16 pg 20 of 29 15 04 2019 ATTACH TIMBER H10 INSTALLATION INSTRUCTIONS 17 18 ATTACH TYRES USING D SHACKLE SETS AS SHOWN USING 274 M12X230 656 M12 102003 01 H10 230 BOLT...

Page 21: ...TIMBER H11 TO WEAVING POST UPRIGHTS USING 274 M12X180 200 656 M12 102003 01 USING M12 X 50MM SOCKET NUT ON EYEBOLT CHAINS D SHACKLE SETS ON MIDDLE CHAINS NOTES REPEAT EYEBOLT CHAIN ON BOTH SIDES ATTAC...

Page 22: ...DVENTURE TRAIL 16 pg 22 of 29 15 04 2019 ATTACH H8 HEXBOARD SLATS INSTALLATION INSTRUCTIONS 21 USING 8X80MM WOOD SCREWS H8 H8 22 ATTACH ROPE TRAVERSE TO TIMBERS U10 U11 AS SHOWN USING 656 M10 102003 0...

Page 23: ...STALLATION INSTRUCTIONS 23 USING 656 M12 102003 01 274 M12X200 24 ATTACH H16 TIMBER USING 274 M12X180 656 M12 102003 01 H16 H16 NOTES DO NOT ATTACH H13a LOOSE HEX BOARD UNTIL STEP 28 NOTES ENSURE THE...

Page 24: ...15 04 2019 ATTACH H15 TIMBERS INSTALLATION INSTRUCTIONS 25 USING PLAYTEC L S M8X80MM WOOD SCREWS 274 M12X200 656 M12 102003 01 26 ATTACH TUNNEL NET USING 656 M12 102003 01 NOTES ATTACH PLAYTEC T S ON...

Page 25: ...L 16 pg 25 of 29 15 04 2019 ATTACH TIMBER H17 INSTALLATION INSTRUCTIONS 27 USING PLAYTEC L S M8X80MM WOOD SCREWS 274 M12X180 656 M12 102003 01 28 ATTACH H13a TIMBER HEXBOARD SLATS USING M8X80MM WOOD S...

Page 26: ...AT16 ADVENTURE TRAIL 16 pg 26 of 29 15 04 2019 ATTACH TIMBER H18 INSTALLATION INSTRUCTIONS 29 USING M8X80MM WOOD SCREWS 30 ATTACH CARGO NET USING PLAYTEC L S M8X80MM WOOD SCREWS 656 M12 102003 01 H18...

Page 27: ...019 ATTACH TIMBER CLIMBING PANELS INSTALLATION INSTRUCTIONS 31 USING M8X80MM WOOD SCREWS ENSURE SCREWS DO NOT CROSS 32 ATTACH TRAVERSE ROPE 3 USING 656 M10 102003 01 U15 U14 U13 NOTES ENSURE PANELS AR...

Page 28: ...AT16 ADVENTURE TRAIL 16 pg 28 of 29 15 04 2019 ATTACH TRAVERSE ROPE CHAIN INSTALLATION INSTRUCTIONS 33 USING M12 X 50MM SOCKET NUT ON EYEBOLT CHAINS 34 ATTACH H17 UNDER BRACKETS USING M8X80MM WOOD SCR...

Page 29: ...REF AT16 ADVENTURE TRAIL 16 pg 29 of 29 15 04 2019 ADDITIONAL DIMENSIONS MAX FALL HEIGHT...

Reviews: