11
STEPS & TIPS:
• Install power cord and level control cord to pump. Make sure alignment mark on cord aligns with alignment mark on
terminal block. Use hardware provided to mount cord flange to pump. Note that one connection has small pins and
one as large pins. Install the proper cord into the proper socket (See Figure 4).
• Bowline knot lifting device (rope) to handles. See Bowline knot detail (See Figure 2).
FIGURE 6
(Standard ESPS shown, SensaPRO optional)
Summary of Contents for OGP2022CO Series
Page 14: ...14 FIGURE 9 ...
Page 16: ...16 Wiring for Optional Remote Alarm Light FIGURE 11 ...
Page 20: ...20 FIGURE 16 EXPLODED VIEW FIXED DISCHARGE UPGRADE CORE ...
Page 22: ...22 FIGURE 17 EXPLODED VIEW OGP SERIES ...
Page 24: ...24 FIGURE 18 EXPLODED VIEW OGV SERIES ...
Page 27: ...Notes ...
Page 28: ...Notes ...