
10
CABLE CONNECTIONS:
Power/Control Cable-
Insert female end of cable plug into
housing bore aligning alignment mark with hole in terminal
block see Figures 4 & 5. Tighten bolts on compression
flange until flush with motor housing.
Pump Power - Large Pin
Level/Control - Small Pin
Level control cord has molded fitting at both ends of the
cord. Install one end to the Pump and the other end to the
Level Control.
(Standard ESPS shown, SensaPRO optional)
FIGURE 5
FIGURE 4
Summary of Contents for OGP2022CO Series
Page 14: ...14 FIGURE 9 ...
Page 16: ...16 Wiring for Optional Remote Alarm Light FIGURE 11 ...
Page 20: ...20 FIGURE 16 EXPLODED VIEW FIXED DISCHARGE UPGRADE CORE ...
Page 22: ...22 FIGURE 17 EXPLODED VIEW OGP SERIES ...
Page 24: ...24 FIGURE 18 EXPLODED VIEW OGV SERIES ...
Page 27: ...Notes ...
Page 28: ...Notes ...