19
SGV 2 HP Assembly
Bearings to Pump Rotor
When replacing bearings, be careful not to damage the rotor or shaft threads. Using an arbor press, hold
the rotor and press the upper bearing on the rotor shaft, applying force to the inner race of the bearing
only. Install top retaining ring on rotor shaft. Using an arbor press, hold the rotor and press the lower
bearing on the rotor shaft, apply force to the inner race of the bearing only. Install bottom-retaining ring on
rotor shaft. The bearing will be positioned between the retaining rings.
Intermediate Coupling Component Parts
If pump is equipped with optional moisture sensors, apply thread compound (Permatex) to threads on
probes and install in intermediate coupling. Connect wires to probes with machine screw. Note: If pumps
are not equipped with moisture sensors, probes will be replaced by pipe plugs, install with permatex.
Summary of Contents for Barnes SGV 2 HP
Page 18: ...18 Inner Seal From intermediate coupling press out stationary seal with a flat screwdriver 34 ...
Page 23: ...23 Pin Placement Diagram Figure Figure B B ...
Page 29: ...29 SGV 2HP Exploded View Figure Figure C C ...
Page 31: ...31 Notes ...
Page 32: ...CRANE PUMPS SYSTEMS INC 420 THIRD STREET PIQUA OHIO 45356 U S A ...