Crane BARNES SE51HT Series Installation And Operation Manual Download Page 7

7

MODEL NO HP VOLT/PH Hz RPM

(Nom)

NEMA

START

CODE

FULL

LOAD

AMPS

LOCKED

ROTOR

AMPS

CORD

SIZE

CORD

TYPE

CORD

O.D

inch (mm)

WINDING RESISTANCE

Franklin

Main-Start

G.E.

Main-Start

SE51HT

0.5

120/1

60

1750

R

17.0

63.8

14/3

SOW

0.530

*

*

Winding Resistance ± 5%, measured from terminal block
Pump Rated for Operation at ± 10% Voltage at Motor.

Frankling Motor:

(*) When checking winding resistance of these motors, disconnect leads to solid state switch. Once leads have been disconnected resis-
tance should read as follows:
(2MAINS) Yellow & Blue = 1/79 ohms; Grey & Orange = 1.79 ohms,
(START WINDINGS) Red & Orange = 5.99 ohms.

GE Motor:

(*) When checking winding resistance of these motors, resistance should read as follows:
(2MAINS) White (T2) & Brown (P2) = 1.64
 

   Orange (T3) & Yellow (T4) = 1.64

(START WINDINGS) Orange (T3) & Black (T5) = 3.05

SECTION: D START-UP OPERATION

D-1) Check Voltage and Phase:

Before operating pump, compare the voltage and phase 
information stamped on the pump identifi cation plate to the 
available power.

D-2) Check Pump Rotation:

Before putting pump into service for the fi rst time, the motor 
rotation must be checked. Improper motor rotation can 
result in poor pump performance and can damage the motor 
and/or pump. To check the rotation, suspend the pump 
freely, momentarily apply power and observe the “kickback”. 
“Kickback” should always be in a counter-clockwise direction 
as viewed from the top of the pump motor housing.

D-2.1) Incorrect Rotation for Single-Phase Pumps:

In the unlikely event that the rotation is incorrect for a single 
phase pump, contact a Barnes Pumps Service Center.

D-3) Start-Up Report:

Included at the end of this manual is a start-up report form, 
this form is to be completed as applicord. Return one copy to 
Barnes Pumps and store a copy in the control panel or with 
the pump manual if no control panel is used. It is important 
to record this data at initial start-up since it will be useful to 
refer to should servicing the pump be required in the future.

D-3.1) Identifi cation Plate:

Record the numbers from the pump identifi cation plate on 
both START-UP REPORT provided at the end of the manual 
for future reference.

D-3.2) Insulation Test:

Before the pump is put into service, an insulation (megger) 
test should be performed on the motor. The resistance values 
(ohms) as well as the voltage (volts) and current (amps) 
should be recorded on the start-up report.

D-3.3) Pump-Down Test:

After the pump has been properly wired and lowered into the 
basin, sump or lift station, it is advisable to check the system 
by fi lling with liquid and allowing the pump to operate through 
its pumping cycle. The time needed to empty the system, or 
pump-down time along with the volume of water, should be 
recorded on the start-up report.

SECTION E: PREVENTATIVE MAINTENANCE

As the motor is oil fi lled, no lubrication or other maintenance 
is required, and generally Barnes Pumps will give very 
reliable service and can be expected to operate for years on 
normal sewage pumping without failing. However as with any 
mechanical piece of equipment a preventive maintenance 
program is recommended and suggested to include the 
following checks:

1)   Inspect motor chamber for oil level and contamination
 

and repair as required per section F-1.

2)  Inspect impeller and body for excessive build-up or
 

clogging and repair as required per section F-2.

3)  Inspect motor and bearings and replace as required 
 

per section F-3.

4)  Inspect seal for wear or leakage and repair as required
 

per section F-4.

SECTION F: SERVICE AND REPAIR

NOTE:

 All item numbers in ( ) refer to Figures 15 and 16.

F-1) Lubrication:

Anytime the pump is removed from operation, the cooling oil 
in the motor housing (6) should be checked visually for oil 
level and contamination.

F-1.1) Checking Oil:
Motor Housing -

 To check oil, set unit upright. Remove pipe 

plug (39) from motor housing (6). With a fl ashlight,  visually 
inspect the oil in the motor housing (6) to make sure it is 
clean and clear, light amber in color and free from suspended 
particles. Milky white oil indicates the presence of water. Oil 
level should be just above the motor when pump is in vertical 
position.

F-1.2) Testing Oil:
1.) 

Place pump on it’s side, remove pipe plug (39), from

 

motor housing (6) and drain oil into a clean, dry container.

2.)

  Check oil for contamination using an oil tester with a

 

range to 30 Kilovolts breakdown.

3.) 

If oil is found to be clean and uncontaminated

 

(measuring above 15 KV. breakdown), refi ll the motor

 

housing as per section F-1.4.

Summary of Contents for BARNES SE51HT Series

Page 1: ...duct improvement program product changes may occur As such Crane Pumps Systems reserves the right to change product without prior written notification 420 Third Street 83 West Drive Bramton Piqua Ohio 45356 Ontario Canada L6T 2J6 Phone 937 778 8947 Phone 905 457 6223 Fax 937 773 7157 Fax 905 457 2650 www cranepumps com Form No 111124 Rev L Series SE51HT 5HP 1750RPM 60 Hz Single Seal High Temperatu...

Page 2: ...EXPLODED VIEW Fig 16 14 PARTS LIST 15 RETURNED GOODS POLICY 15 WARRANT 16 START UP REPORT 17 18 WARRANTY REGISTRATION SPECIAL TOOLS AND EQUIPMENT INSULATION TESTER MEGGER DIELECTRIC TESTER SEAL TOOL KIT see parts list PRESSURE GAUGE KIT see parts list Other brand and product names are trademarks or registered trademarks of their respective holders Barnes is a registered trademark of Crane Pumps Sy...

Page 3: ...ert fingers in pump with power connected Always wear eye protection when working on pumps Make sure lifting handles are securely fastened each time before lifting DO NOT operate pump without safety devices in place Always replace safety devices that have been removed during service or repair Secure the pump in its operating position so it can not tip over fall or slide DO NOT exceed manufacturers ...

Page 4: ...ER BEARING Design Single Row Ball Oil Lubricated Load Radial Thrust MOTOR Design NEMA L Single phase Torque Curve Oil Filled Squirrel Cage Induction Insulation Class F SINGLE PHASE Split Phase Includes overload protection in motor OPTIONAL EQUIPMENT Inlet Strainer 3 4 Spherical Soilds handling with optional inlet strainer SECTION A PUMP SPECIFICATIONS inches mm IMPORTANT 1 PUMP MAY BE OPERATED DRY...

Page 5: ...lift station or basin The sump lift station or basin shall be vented in accordance with local plumbing codes This pump is designed to pump sewage effluent or other nonexplosive or noncorrosive wastewater and shall NOT be installed in locations classified as hazardous in accordance with the National Electrical Code NEC ANSI NFPA 70 or the Canadian Electrical Code CEC Never install the pump in a tre...

Page 6: ...and Control Cords The cord assembly mounted to the pump must not be modified in any way except for shortening to a specific application Any splice between the pump and the control panel must be made in accordance with all applicord electric codes It is recommended that a junction box if used be mounted outside the sump or be of at least Nema 4 EEMAC 4 construction if located within the wet well DO...

Page 7: ...3 2 Insulation Test Before the pump is put into service an insulation megger test should be performed on the motor The resistance values ohms as well as the voltage volts and current amps should be recorded on the start up report D 3 3 Pump Down Test After the pump has been properly wired and lowered into the basin sump or lift station it is advisable to check the system by filling with liquid and...

Page 8: ...oil level and inspect joints for air bubbles For sealed areas below the oil level leaks will seep oil If after five minutes the pressure is still holding constant and no bubbles oil seepage is observed slowly bleed the pressure and remove the gauge assembly If the pressure does not hold then the leak must be located and repaired F 1 4 Replacing Oil Motor Housing Set unit upright and refill with ne...

Page 9: ...Face Clean and oil seal cavity in seal plate 5 Make sure the stationary member is in straight Slide a bullet see parts list seal tool kit over motor shaft Lightly oil DO NOT use grease shaft bullet and inner surface of bellows on rotating member 28b see Figure 9 With lapped surface of rotating member 28b facing inward toward stationary member slide rotating member over bullet and onto shaft using ...

Page 10: ... and motor shaft squarely into the seal plate 5 until bearing seats on the bottom Place stator over rotor lining up motor bolts with holes in seal plate 5 Torque motor tie bolts to 17 in lbs Set square ring 27 in groove on seal plate 5 F 4 3 Wiring Connections Check power cables 16 for cracks or damage and replace if required see Figure 12 Make internal wiring connections which are independent of ...

Page 11: ...ructions G 2 PART NUMBER The part number consists of a six 6 digit number which ap pears in the catalog A one or two letter suffix may follow this number to designate the design configuration This number is used for ordering and obtaining information G 3 MODEL NUMBER This designation consists of numbers and letters which rep resent the discharge size series horsepower motor phase and voltage speed...

Page 12: ...eller for freedom of operation security and condition Clean impeller and inlet of any obstruction 9 Loosen union slightly to allow trapped air to escape Verify that turn off level of switch is set so that the suction is always flooded Clean vent hole 10 Check rotation If power supply is three phase reverse any two of three power supply leads to ensure proper impeller rotation 11 Repair fixtures as...

Page 13: ...13 FIGURE 15 SE HT High Temp Series Single Seal ...

Page 14: ...14 FIGURE 16 SE HT High Temp Series Single Seal ...

Page 15: ...51 224 O ring 21 1 103584 Terminal Block 1 Phase 22 1 105111 Ground Wire Assembly 23 1 016660 Screw Self Tapping 8 32 x 375 Lg 24 1 085326 Retaining Ring Included with motor 25 1 017414 Bearing 26 4 1 135 1 Cap Screw 5 16 18 x 1 75 Lg Stainless 27 1 027269 Square Ring 28 1 005080 Shaft Seal Carbon Ceramic Buna N 33 1 084346TH Impeller Cast Iron 5 00 Dia 36 1 027344 Gasket 39 1 014270 Pipe Plug 375...

Page 16: ...rformance specifications must be in writing and such writing must be signed by our authorized representative Due to inaccuracies in field testing if a conflict arises between the results of field testing conducted by or for user and laboratory tests corrected for field performance the latter shall control RECOMMENDATIONS FOR SPECIAL APPLICATIONS OR THOSE RESULTING FROM SYSTEMS ANALYSES AND EVALUAT...

Page 17: ...ent To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material All Applicable Laws And Regulations Shall Apply IMPORTANT WARRANTY REGISTRATION Your product is covered by the enclosed Warranty To complete the Warranty Registration Form go to http www cranepumps com ProductRegistration If you have a claim under the provision of the warranty contact your local Crane Pump...

Page 18: ...Notes ...

Reviews: