B-1) To the Purchaser:

 

Congratulations! You are the owner of one of the fi nest pumps 
on the  market today. CP&S  pumps  are  products engineered 
and  manufactured  of  high  quality  components.  Over  one 
hundred  years  of  pump  building  experience  along  with  a 
continuing  quality  assurance  program  combine  to  produce  a 
pump  which  will  stand  up  to  the  toughest  applications.  This 
manual will provide helpful information concerning installation, 
maintenance, and proper service guidelines.

B-2) Receiving:

 

Upon receiving the pump, it should be inspected for damage 
or shortages. If damage has occurred, fi le a claim immediately 
with  the  company  that  delivered  the  pump.  If  the  manual 
is  removed  from  the  packaging,  do  not  lose  or  misplace.

B-3) Storage:
Short  Term-

  CP&S  Pumps  are  manufactured  for  effi  cient 

performance  following  short  inoperative  periods  in  storage. 
For best results, pumps can be retained in storage, as factory 
assembled,  in  a  dry  atmosphere  with  constant  temperatures 
for  up  to  six  (6)  months.  Long  Term-  Any  length  of  time 
exceeding six (6) months, but not more than twenty-four (24) 
months. The unit should be stored in a temperature controlled 
area, a roofed over walled enclosure that provides protection 
from  the  elements  (rain,  snow,  wind-blown  dust,  etc.),  and 
whose  temperature  can  be  maintained  between  +40  deg.  F 
and +120 deg. F. (4.4 - 49°C). Pump should be stored in its 
original shipping container. On initial start up, rotate impeller 
by  hand  to  assure  seal  and  impeller  rotate  freely.  If  it  is 
required that the pump be installed and tested before the long 
term storage begins, such installation will be allowed provided:

1.)  The pump is not installed under water for more than
 

one (1) month.

2.)  Immediately upon satisfactory completion of the test,
 

the pump is removed, thoroughly dried, repacked in the

 

original shipping container, and placed in a temperature

 

controlled storage area.

B-4) Service Centers:

 

For the location of the nearest Barnes Service Center, check 
your Barnes representative or Crane Pumps & Systems, Inc., 
Service Department in Piqua, Ohio, telephone (937) 778-8947 
or Crane Pumps & Systems Canada, in Brampton, Ontario, 
(905) 457-6223.

SECTION C: INSTALLATION

C-1) Location:

 

These pumping units are self-contained and are recommended 
for use in a sump, lift station or basin that is free of hard debris, 
like  gravel,  stones,  sand,  or  earth.  The  sump,  lift  station  or 
basin shall be vented in accordance with local plumbing codes. 
This  pump  is  designed  to  pump  sewage,  effl  uent,  or  other 
nonexplosive or noncorrosive wastewater. and shall 

NOT

 be 

installed  in  locations  classifi ed  as  hazardous  in  accordance 
with the National Electrical Code (NEC), ANSI/NFPA 70 or the 
Canadian Electrical Code (CEC). Never install the pump in a 
trench, ditch or hole with gravel, stones, sand, or earth bottom; 
the  legs  will  sink  into  the  dirt  and  the  suction  will  become 
plugged, or the pump impeller will be damaged.

C-1.1) Submergence:

It is recommended that the pump be operated in the submerged 
condition and the sump liquid level should never be lower than 
the top of the pump (see Fig 2). 

C-2) Discharge:

Discharge piping should be as short as possible. Both a check 
valve and a shut-off  valve are recommended for each pump 
being  used.  The  check  valve  is  used  to  prevent  backfl ow 
into  the  sump.  Excessive  backfl ow  can  cause  fl ooding 
and/or  damage  to  the  pump.  The  shut-off   valve  is  used  to 
stop  system  fl ow  during  pump  or  check  valve  servicing.

Barnes  Pumps  supplies  a  Stainless  Rail  Package    for 
the  2”  models  and  also  a  variety  of  2”  and  3”  break  away 
fi tting  discharge  systems  (see  Fig.  1)  designed  to  allow  the 
submersible  wastewater  pump  to  be  installed  or  removed 
without requiring personnel to enter the wet well. Contact your 
local Barnes Pumps distributor for complete details.

Stainless  Rail  Package  (Not  Shown)  -  The  package  system 
comes complete and ready to place into the ground as outlined 
in the project specifi cations. The moveable portion of the Break 
Away  Fitting  (BAF),  check  valve,  piping  and  guide  bracket 
comes  assembled  on  the  pump  along  with  the  lifting  cord. 
Insert  pump  bracket  and  moveable  portion  of  BAF  into  the 
guide channel and lower pump into basin 

(DO NOT DROP)

Now connect power and control cords to the junction box or 
control panel depending on system design.
 

C-3) Liquid Level Controls:

The level controls are to be supported by a mounting bracket that 
is attached to the sump wall, cover or junction box. Cord grips 
are used to hold the cords in place on the mounting bracket. 
The  control  level  can  be  changed  by  loosening  the  grip  and 
adjusting the cord length as per the plans and specifi cations. 
Be certain that the level controls cannot hang up or foul in it’s 
swing and that the pump is completely submerged when the 
level control is in the “Off ” mode.

FIGURE 1

Summary of Contents for 104918

Page 1: ...provement program product changes may occur As such Crane Pumps Systems reserves the right to change product without prior written notification 420 Third Street 83 West Drive Bramton Piqua Ohio 45356 Ontario Canada L6T 2J6 Phone 937 778 8947 Phone 905 457 6223 Fax 937 773 7157 Fax 905 457 2650 www cranepumps com Form No 105241 Rev AF Series 2SEV 3SEV L DS 5 75 1 HP 1750 3450 RPM 60 Hz Single and D...

Page 2: ...Fig 17 19 DOUBLE SEAL CROSS SECTION Fig 18 20 DOUBLE SEAL EXPLODED VIEW Fig 19 21 PARTS LIST 22 24 RETURNED GOODS POLICY 28 WARRANTY 27 WARRANTY REGISTRATION SPECIAL TOOLS AND EQUIPMENT INSULATION TESTER MEGGER DIELECTRIC TESTER SEAL TOOL KIT see parts list PRESSURE GAUGE KIT see parts list Other brand and product names are trademarks or registered trademarks of their respective holders Barnes is ...

Page 3: ...ert fingers in pump with power connected Always wear eye protection when working on pumps Make sure lifting handles are securely fastened each time before lifting DO NOT operate pump without safety devices in place Always replace safety devices that have been removed during service or repair Secure the pump in its operating position so it can not tip over fall or slide DO NOT exceed manufacturers r...

Page 4: ...n Insulation Class B Class F on selected models SINGLE PHASE Permanent Split Capacitor PSC Includes overload protection in motor THREE PHASE 200 240 480 is Tri voltage motor 600V Requires overload protection to be included in control panel OPTIONAL EQUIPMENT Seal Material Impeller Trims Additional Cord N C Temperature Sensors with cord for 3 Phase pumps Requires relay in Control Panel N O Moisture...

Page 5: ... 2SEV DS Series 3SEV L Series 3SEV DS Series Plugs for 120 Volt and 5Hp 240 Volt Single Phase Models Plugs for 120 Volt and 5Hp 240 Volt Single Phase Models Plugs for 120 Volt and 5Hp 240 Volt Single Phase Models ...

Page 6: ...ation or basin that is free of hard debris like gravel stones sand or earth The sump lift station or basin shall be vented in accordance with local plumbing codes This pump is designed to pump sewage effluent or other nonexplosive or noncorrosive wastewater and shall NOT be installed in locations classified as hazardous in accordance with the National Electrical Code NEC ANSI NFPA 70 or the Canadian ...

Page 7: ... operations Automatic Plug float cord into outlet then plug pump cord into float cord Manual Plug pump cord directly int outlet C 4 Electrical Connections C 4 1 Power and Control Cords The cord assembly mounted to the pump must not be modified in any way except for shortening to a specific application Any splice between the pump and the control panel must be made in accordance with all applicord elect...

Page 8: ...104986 1 0 600 3 60 3450 L B 2 9 8 7 14 4 SOW 0 570 14 5 21 20 34 57 2SEV514DS 104923 0 5 120 1 60 1750 F B 12 0 21 3 14 3 SJTOW 0 375 9 5 1 51 16 10 2SEV524DS 104924 0 5 240 1 60 1750 J B 6 3 14 9 14 3 SOW 0 530 13 5 3 38 9 30 5 69 18 74 2SEV594DS 104925 0 5 200 240 3 60 1750 H L B 3 7 3 8 9 8 11 0 14 4 SOW 0 570 14 5 10 20 13 00 2SEV544DS 104926 0 5 480 3 60 1750 K B 1 9 5 3 14 4 SOW 0 570 14 5 ...

Page 9: ...105008 1 0 600 3 60 3450 L B 2 9 8 7 14 4 SOW 0 570 14 5 21 20 34 57 3SEV514DS 104949 0 5 120 1 60 1750 F B 12 0 21 3 14 3 SJTOW 0 375 9 5 1 51 16 10 3SEV524DS 104950 0 5 240 1 60 1750 J B 6 3 14 9 14 3 SOW 0 530 13 5 3 38 9 30 5 69 18 74 3SEV594DS 104951 0 5 200 240 3 60 1750 H L B 3 7 3 8 9 8 11 0 14 4 SOW 0 570 14 5 10 20 13 00 3SEV544DS 104952 0 5 480 3 60 1750 K B 1 9 5 3 14 4 SOW 0 570 14 5 ...

Page 10: ...e for the first time the motor rotation must be checked Improper motor rotation can result in poor pump performance and can damage the motor and or pump To check the rotation suspend the pump freely momentarily apply power and observe the kickback Kickback should always be in a counter clockwise direction as viewed from the top of the pump motor housing D 2 1 Incorrect Rotation for Three Phase Pump...

Page 11: ... are observed slowly bleed the pressure and remove the gauge assembly Replace oil as described in section F 1 4 If the pressure does not hold then the leak must be located and repaired Pumps that have NOT had the oil drained from the Motor Housing The pressure test may be done with the oil at its normal level Remove pipe plug 39 from motor housing 6 Apply pipe sealant to pressure gauge assembly an...

Page 12: ... Apply thread locking compound 57 to shaft threads then install jam nut 66 and torque to 40 ft lbs It is important that the spring of the lower shaft seal 28 seats in the hub of the impeller 33 Rotate impeller to check for binding Position gasket 36 on volute flange and place spacer ring 31 over it Place another gasket 36 on spacer ring and position impeller and motor housing on spacer ring 31 Posi...

Page 13: ... 28b are together see Figure 8 It is extremely important to keep seal faces clean during assembly Dirt particles lodged between these faces will cause the seal to leak Place spring 28c over shaft and in place on rotating member 28b making sure it is seated on retainer and not cocked or resting on bellows tail Slide retaining ring 28d over shaft and let rest on spring 28c Replace snap ring 32 in gr...

Page 14: ...k rotor for wear If rotor or the stator windings are defective the complete motor must be replaced Important All parts must be clean before reassembly F 4 2 Reassembly Moisture Sensors DS Models If pump is equipped with optional moisture sensors reassemble by applying thread compound to threads on probes 4 and install in upper seal plate 5 see Figures 17 and 18 Connect wire assemblies 53 to probes...

Page 15: ...sh the following information 1 Pump serial number and date code Paragraph G 4 2 Pump model number Paragraph G 3 3 Pump part number Paragraph G 2 4 Part description 5 Item part number 6 Quantity required 7 Shipping instructions 8 Billing Instructions G 2 PART NUMBER The part number consists of a six 6 digit number which appears in the catalog A one or two letter suffix may follow this number to desig...

Page 16: ...16 FIGURE 15 CONTIUED ...

Page 17: ... Check cutter for freedom of operation security and condition Clean cutter and inlet of any obstruction 9 Loosen union slightly to allow trapped air to escape Verify that turn off level of switch is set so that the suction is always flooded Clean vent hole 10 Remove examine for damage Replace pump stator if required 11 Repair fixtures as required to eliminate leakage 12 Check pump temperature limits ...

Page 18: ...18 FIGURE 16 2SEV L 3SEV L Series Single Seal ...

Page 19: ...19 FIGURE 17 2SEV L 3SEV L Series Single Seal ...

Page 20: ...20 FIGURE 18 2SEV DS 3SEV DS Series Double Seal ...

Page 21: ...21 FIGURE 19 2SEV DS 3SEV DS Series Double Seal ...

Page 22: ...744DS 2SEV1094DS 2SEV1044DS 071354BD 3SEV1094DS 3SEV1044DS 092855BS 2SEV754L 3SEV754L 2SEV1054L 3SEV1054L 092855BD 2SEV754DS 3SEV754DS 2SEV1054DS 3SEV1054DS 068926BS 2SEV512L 3SEV512L 068926BD 2SEV512DS 3SEV512DS 068927BS 2SEV522L 3SEV522L 068927BD 2SEV522DS 3SEV522DS 068928BS 2SEV1022L 3SEV1022L 068928BD 2SEV1022DS 3SEV1022DS 071355BS 2SEV532L 2SEV542L 2SEV562L 3SEV532L 3SEV542L 3SEV562L 2SEV1032...

Page 23: ... 27008 62 Retaining Ring All double seal 33 1 Impeller Cast Iron 3450RPM 105144TH 4 25 Dia STD for a 1 0 HP 105144TJ 4 13 Dia 105144TK 4 00 Dia 105144TL 3 88 Dia 105144TM 3 75 Dia 105144TN 3 63 Dia 105144TP 3 50 Dia STD for a 5 HP 105144TQ 3 38 Dia 105144TR 3 25 Dia Impeller Cast Iron 1750RPM 105152TB 6 75 Dia STD for a 1 0 HP 105152TC 6 63 Dia 105152TD 6 50 Dia 105152TE 6 38 Dia 105152TF 6 25 Dia...

Page 24: ...625 02117 Sleeve Fiberglass 66 1 030068 Jam Nut 1 2 20 SS 69 1 111909 Jumper Wire TABLE 2 POWER SENSOR CORD SETS CABLE LENGTH ITEM 16 120 VOLT 1 PHASE plug included ITEM 16 240 VOLT 1 PHASE 0 5HP plug included ITEM 16 240 VOLT 1 PHASE 0 75 1HP no plug ITEM 16 3 PHASE no plug ITEM 56 OPTIONAL Temperature 3 Phase ITEM 56 OPTIONAL Moisture and Temperature Sensor 3 Phase or Moisture Sensor 8 FT 103756...

Page 25: ...25 Notes ...

Page 26: ...26 Notes ...

Page 27: ... PXVW EH VLJQHG E RXU DXWKRUL HG UHSUHVHQWDWLYH XH WR LQDFFXUDFLHV LQ HOG WHVWLQJ LI D FRQÀ LFW DULVHV EHWZHHQ WKH UHVXOWV RI HOG WHVWLQJ FRQGXFWHG E RU IRU XVHU DQG ODERUDWRU WHVWV FRUUHFWHG IRU HOG SHUIRUPDQFH WKH ODWWHU VKDOO FRQWURO 5 200 1 7 216 25 63 33 7 216 25 7 26 5 68 7 1 520 6 67 06 1 6 6 1 9 8 7 216 21 8 7 6 21 285 67 9 3 5 1 1 38 6 1 8675 1 250 7 21 68 5 200 1 7 216 2 127 2167 787 55 ...

Page 28: ...ent To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material All Applicable Laws And Regulations Shall Apply IMPORTANT WARRANTY REGISTRATION Your product is covered by the enclosed Warranty To complete the Warranty Registration Form go to http www cranepumps com ProductRegistration If you have a claim under the provision of the warranty contact your local Crane Pump...

Reviews: