16
INSTALLATION STEP 5
Hang the Opener
Three representative installations are shown. Yours may
be different. Hanging brackets should be angled (Figure
1) to provide rigid support. On finished ceilings (Figure 2
and Figure 3), attach a sturdy metal bracket to structural
supports before installing the opener. This bracket and
fastening hardware are not provided.
1. Measure the distance from each side of the motor unit
to the structural support.
2. Cut both pieces of the hanging bracket to required
lengths.
3. Drill 3/16" pilot holes in the structural supports.
4. Attach one end of each bracket to a support with
5/16"-18x1-7/8" lag screws.
5. Fasten the opener to the hanging brackets with 5/16"-
18x7/8" hex bolts, lock washers and nuts.
6. Check to make sure the rail is centered over the door
(or in line with the header bracket if the bracket is not
centered above the door).
7. Remove the 2x4. Operate the door manually. If the
door hits the rail, raise the header bracket.
NOTE:
DO NOT connect power to opener at
this time.
To avoid possible SERIOUS INJURY from a falling garage
door opener, fasten it SECURELY to structural supports of
the garage. Concrete anchors MUST be used if installing any
brackets into masonry.
Lag Scre
w
5/16"-1
8
x1-7/
8
"
Hex Bolt
5/16"-1
8
x7/
8
"
Nu
t 5/16"-1
8
Lock
W
asher 5/16"
HARDWARE SHOWN ACTUAL SIZE
Meas
u
re
Distance
Lag Scre
w
s
5/16"-1
8
x1-7/
8
"
Str
u
ct
u
ral
S
u
pports
Bracket
(
N
ot Pro
v
ided)
Lag Scre
w
s
5/16"-1
8
x1-7/
8
"
Hidden
S
u
pport
Bolt 5/16"-1
8
x7/
8
"
Lock
W
asher 5/16"
Nu
t 5/16"-1
8
(
N
ot Pro
v
ided)
Bolt 5/16"-1
8
x7/
8
"
Lock
W
asher 5/16"
Nu
t 5/16"-1
8
FINISHED CEILING
Bolt 5/16"-1
8
x7/
8
"
Lock
W
asher 5/16"
Nu
t 5/16"-1
8
Bolt 5/16"-1
8
x7/
8
"
Lock
W
asher 5/16"
Nu
t 5/16"-1
8
Lag Scre
w
s
5/16"-1
8
x1-7/
8
"
FINISHED CEILING
(
N
ot Pro
v
ided)
Bolt 5/16"-1
8
x7/
8
"
Lock
W
asher 5/16"
Nu
t 5/16"-1
8
Figure 1
Figure 2
WARNING
CAUTION
WARNING
WARNING
Figure 3