7
SETUP
Before setting up your machine you should
read and understand the instructions given
in this manual.
While setting up your machine, consider
existing and anticipated needs, size of the
materials to be processed and etc.. so that
you don't have to move your machine for
larger work-pieces.
UNPACKING
The machine is properly packaged and
shipped completely in carton for safe
transportation. When unpacking, carefully
inspect the carton and ensure that nothing
has been damaged during transit.
Open the carton and check that the
machine and the parts are in good
condition.
LIST OF CONTENTS QTY
A.
Sander ............................................. 1
B.
Stand Lower Brackets (Long) .......... 2
C.
Stand Lower Brackets (Short) .......... 2
D.
Stand Upper Brackets (Long) .......... 2
E.
Stand Upper Brackets (Short) .......... 2
F.
Rubber Feet ..................................... 4
G.
Dust Hood ........................................ 2
H.
Dust Hood Coupler .......................... 1
I.
Sanding Table.................................. 1
J.
Sanding Table Support Rod............. 1
K.
Miter Gauge ..................................... 1
L.
Backstop .......................................... 1
M.
9" Sanding Disc ............................... 1
N.
6" Sanding Belt ................................ 1
WARNING!
CT180 is a heavy machine, do not over-
exert yourself. For safe moving method
use a mechanical device or get the help
of an assistant.
IMPORTANT
While unpacking the CT180, if you can
not find any part of the machine, check if
it is already installed on the machine.
Some parts come installed on the
machine due to shipping purposes.
Summary of Contents for CT180
Page 1: ...CT180 6 x 48 BELT AND 9 DISC SANDER User Manual ...
Page 20: ...20 TROUBLESHOOTING ...
Page 21: ...21 ...