![CPS AC-PLC KIT-800V/US Installation And Operation Manual Download Page 15](http://html.mh-extra.com/html/cps/ac-plc-kit-800v-us/ac-plc-kit-800v-us_installation-and-operation-manual_2675194015.webp)
Mechanical Installation
15 / 32
3.
Drill four holes with a Ф10mm drill at the marked position as shown below.
Figure 3-3 Drill holes at the marked position
4.
Lift the AC-PLC KIT to make it aligned with above mentioned drilled holes
and fasten four fixing bracket (2) of the enclosure into the drilled holes of the
mounting bracket (3) with four M8x25 screws (1) and M8 flange nuts included
in the accessory bag.
Tools required: 14# socket wrench, torque: 12.5N.m.
Figure 3-4 Fasten fixing bracket of the enclosure into drilled holes
WARNING!
The installation surface shall be kept smooth and flat whether it is installed
on a wall or rack. Otherwise, the enclosure may be deformed or damaged,
thus developing a risk of water entering the product.