Installation 

Alio™ Note Card Reader 

 

Published by CPI 

44060-IG-01-01-EN_CPI_Alio Note Card Reader_Installation Guide_V1.0_.docx 

 

3.4.1

 

Removing existing old telemeter and bezel from note validator 

1

 

Turn off power to the vending machine. 

2

 

Use the nut driver to 

unscrew the four hex nuts from the note validator’s mounting posts 

and remove note validator. Keep nuts for reassembly.

 

3

 

Disconnect the note validator’s cabling.

 

4

 

Disconnect all connections to the telemeter.

 

5

 

Remove the antenna from the top of the vendor.

 

6

 

Seal the antenna hole in the machine (cp. your company’s procedure). 
The hole is no longer needed because the antenna is contained within the new card reader bezel.

 

7

 

Remove screw fixing the note validator’s control board cover and pull to remove. Keep the screw 
for reassembly.

 

: : 

The Series 2000 control board cover is not attached with a screw. When installing onto a Series 2000, slide the cover off of the 
chassis. 
 

8

 

Disconnect the ribbon cable if the existing bezel is connected to the control 
board.

 

9

 

Unscrew four bezel screws and remove the bezel and its mounting plate. 

3.4.2

 

Installing the Alio Note card reader 

10

 

Use two of four identical fixing screws enclosed in the hardware bag to fasten the card reader’s mounting plate to the note validator. 

11

 

Route card reader ribbon cable to the top and over the mounting plate. 

 

Please make sure that the card reader’s green ground cable is not pinched when fastening the card reader 
in the next step. 
 

12

 

Use the two remaining fixing screws to fasten the card reader at the top and a smaller fixing screw to fasten the card reader to the note 
validator at the bottom. 

13

 

Route the connection hub cable and the green ground cable through the cable management slot in the mounting plate. 

14

 

Attach the card reader’s ribbon cable to the note validator’s control board. 

 

Older note validators might not provide a suitable ribbon cable connector. In this case, do not remove the 
ribbon cable. Just route it up as shown in Fig. 6 and
 leave it in routed position. 
 

Fig. 4: Removing note validator’s control board cover 

Fig. 5: Removing note validator bezel and mounting plate

 

Summary of Contents for Alio Note

Page 1: ...250659086 R2 Installation Guide Alio Note Card Reader...

Page 2: ...ting the device only use its original packaging It is only in this way sufficiently protected Changes or modifications to this unit not expressly approved by the party responsible for compliance could...

Page 3: ...1 Symbols 5 2 2 Additional useful technical documentation 5 3 Installation 6 3 1 Parts included 6 3 2 Tools required 6 3 3 Card reader identifier 6 3 4 Installing the Alio Note card reader 7 3 4 1 Re...

Page 4: ...1 01 EN_CPI_Alio Note Card Reader_Installation Guide_V1 0_ docx 1 Version history Rev Change Chapters Concerned Editor Date v1 0 First version all D Sanders K Roese Nov 18 2021 Document Data Part Numb...

Page 5: ...ghout this installation guide to call attention to safety messages and important information related to the card reader Caution indicates a hazardous situation which if not avoided could result in min...

Page 6: ...X cable part no 215637033C Mounting plate part no 250038091 Hardware bag 4 machine thread fixing screws part no 203716001C 1 thread forming fixing screw part no 204306001C 3 2 Tools required Nut drive...

Page 7: ...escribed in this guide may only be carried out by qualified technicians or CPI trained and authorized personnel Risk of damage to the card reader The card reader control board is fitted with component...

Page 8: ...he existing bezel is connected to the control board 9 Unscrew four bezel screws and remove the bezel and its mounting plate 3 4 2 Installingthe Alio Note card reader 10 Use two of four identical fixin...

Page 9: ...der to note validator Fig 9 Reattaching note validator s control board cover 15 Reattach the control board cover The Series 2000 control board cover is not attached with a screw When installing onto a...

Page 10: ...and service 19 Connect all other vendor peripherals to the connection hub as labelled and route all connections using zip ties and snips for cable management if necessary 20 Restore power to the vendi...

Page 11: ...must show proof of purchase when submitting equipment for service during the warranty period Owner will assume all freight charges for shipment of equipment to an authorized service center while unde...

Page 12: ...CONTACT US Crane Payment Innovations Corporate HQ 3222 Phoenixville Pike Suite 200 Malvern PA 19355 USA support cranepi com CPI support...

Reviews: