CPG Freno Installation Manual Download Page 17

Modular Rain Garden

Nationwide Availability

The Concrete Products Group LLC (CPG) consists of regional market leaders in the concrete products 

industry. We offer high performance, cost effective products for the construction of buildings, stormwater 

management and low impact development of sites

800.789.0872

www.concreteproductsgroup.com

2203 E. McCarty Street

Jefferson City MO 65101

To order Freno

 

call 800-299-2594

Summary of Contents for Freno

Page 1: ...A INSTALLATION MANUAL INSTALLATION MANUAL Modular Rain Garden...

Page 2: ...required to install the system one machine operator and one laborer Each Freno module has built in connection inserts that allow easy attachment to lifting equipment using 3 4 common thread bolts The...

Page 3: ...ions of structures The modules each have lifting connections placed to assist in connecting the system to lifting equipment to facilitate placement of the modules during construction and for potential...

Page 4: ...Endless Options The Freno System allows great flexibility in the construction of a variety of structure configurations because it is a kit of parts Here are several examples of possible configuration...

Page 5: ...the site while under construction and divert traffic dangers away from site workers Pre Construction Site Review Obtain engineering plans for the project and any required permits Note any access rest...

Page 6: ...It may be most efficient to place the plant materials after paving has been completed to avoid repetition of effort since performing the paving work may require access from within the bio retention ar...

Page 7: ...rench as much as possible recommendation regarding amount of over excavation and illustration Rendering of plan view of recommended trench configuration If your system will include an under drain exca...

Page 8: ...a level condition to the elevation specified in the plans The leveling pad should be 18 wide and at least 6 thick after compaction see drawing for typical leveling pad dimensions and placement which...

Page 9: ...pact Excavator capable of lifting _____ lbs Attach the lifting attachments to the Freno Module using the lifting connections Figure ___ that allow connection to bolts with 3 4 common thread Connect th...

Page 10: ...een backfilled but will help assure the modules stay in their proper position during construction To assist in leveling the module a heavy plastic covered mallet may be useful to seat the module and m...

Page 11: ...2 Establish a corner by placing next module Using a second T2 panel install the foundation for the intake structure Confirm this module is level at the right elevation and oriented correctly before m...

Page 12: ...t alignment and elevation as you go Step 4 Once the first side is completed start installing the modules on the other side Step 5 Continue installing Modules on this side Place a connecting rod in the...

Page 13: ...Module to provide proper spacing for placement of the last Side Module Step 7 Install the final side Module Step 8 Install the water intake structures using the N Mod ules as shown in Stage 3 D Here...

Page 14: ...Stage 4 below backfill the exterior of the structure near and around the intake structure with angular crushed stone being careful to assure that the T 2 modules remain correctly aligned and level Pl...

Page 15: ...he system are backfilled in alternating lifts Remove temporary shoring Follow the plan specifications for material types and layer thicknesses of the bio retention fill materials Do not compact the in...

Page 16: ...should not be placed in service until all of the drainage area has been stabilized and approved by the inspector If there will be any delays before paving is completed make sure sediment controls rema...

Page 17: ...leaders in the concrete products industry We offer high performance cost effective products for the construction of buildings stormwater management and low impact development of sites 800 789 0872 ww...