![CPG Freno Installation Manual Download Page 13](http://html1.mh-extra.com/html/cpg/freno/freno_installation-manual_2674976013.webp)
12
INST
ALLA
TION MANUAL
Modular Rain Garden
Install Freno
™
Modules
C. Sequence of Module Installation.
Step 6:
Install the other end Module.
Adjust the end Module to
provide proper spacing for
placement of the last Side
Module.
Step 7:
Install the final side Module.
Step 8:
Install the water intake structures using the N• Mod-
ules as shown in Stage 3-D.
Here is where careful
measurement and
orientation of the prior
modules pays off.
Detailed instructions for this
step are found in the next
section.
ST
AGE 3