
www.costway.com
SET-UP PREPARATION
1. Unfold the Kayak from the packaging.
Choose a smooth and clean surface to unfold the kayak. Roll out the
kayak until it is laying flat with top side facing up.
2. Valve operation
Follow the instructions below for valve operation and correct inflation
and deflation procedures.
The kayak’s inflation valve is located near the rear of the kayak. To
close off the valve for inflation, make sure that the center valve pin is
in the “UP” position. If it is in the “DOWN” position, press the valve pin
to “UP” position.
To open the valve for deflation, press down on the valve pin (need not
to turn it) and make sure the center valve pin is in the “DOWN”
position. Be careful of any sand or debris around the valve area when
deflating as small particles could become airborne with the release of
the air pressure.
Always lock the valve cover over the valve stem when in use. This will
prevent accidental air release and entrance of any particles into the air
chambers.
05
Summary of Contents for SP37497
Page 13: ......