![Costar Video Systems CRIS12 Operation Manual Download Page 19](http://html.mh-extra.com/html/costar-video-systems/cris12/cris12_operation-manual_2671091019.webp)
19
Part 2 - Installation
Cascading
Via UTP Cable
1
Connect the RJ-45 uplink ports of system 1 and system 2 using a UTP cable.
2
Check the RJ-45 uplink port LED's status and verify that a normal connection has been
established between the two products.
Remote Connection via an Optical Cable
1
Insert SFP modules into the SFP uplink slots of system 1 and system 2 and then connect the
modules using a fiber optic cable.
2
Check the SFP uplink port LEDs and verify that a normal connection has been established.
Swit
ch
Swit
ch