
7-3
VISE LOADING
The position in which material is placed in the vise can have a significant impact on the cost per cut.
Often, loading smaller bundles can mean greater sawing efficiency.
When it comes to cutting odd-shaped material, such as angles, I-beams, channel,
and tubing, the main point is to arrange the materials in such a way
that the blade cuts through as uniform a width as possible throughout the entire
distance of cut.
The following diagrams suggest some costeffective ways of loading and fixturing. Be sure, regardless of the
arrangement selected, that the work can be firmly secured to avoid damage to the machine or injury to the
operator.
BladeBreak -In
Completing a proper break-in on a new band saw blade will dramatically increase its life.
1. Select the proper band speed for the material to be cut.
2. Reduce the feed force/rate to achieve a cutting rate 20% to 50% of
normal (soft materials require a larger feed rate reduction than harder
materials).
3.Begin the first cut at the reduced rate. Make sure the teeth are forming a chip. Small adjustments to the band
speed may be made in the event of excessive noise/vibration. During the first cut, increase feed rate/force
slightly once the blade fully enters the workpiece.With each following cut, gradually increase feed rate/force until
normal cutting rate is reached.
New blade With
Without
Break-in Break-in
Summary of Contents for C-260NC
Page 2: ......
Page 4: ......
Page 10: ......
Page 14: ...1 4 Illustration Safety Fence Safety Fence Safety Fence...
Page 16: ...1 6 Illustration Emergency Stop Emergency Stop Button...
Page 18: ...1 8 Illustration Safety Labels...
Page 20: ......
Page 25: ...2 5 FLOOR PLAN Machine top view Machine side view...
Page 26: ......
Page 36: ......
Page 66: ......
Page 68: ...5 2...
Page 69: ...5 3...
Page 70: ...5 4...
Page 71: ...5 5...
Page 72: ...5 6...
Page 73: ...5 7...
Page 74: ...5 8...
Page 75: ...5 9...
Page 76: ......
Page 78: ...6 2...
Page 79: ...6 3...
Page 81: ...22 12 12 12 12 8 16 19 20 6 16 21 13 1 3 5 9 6 5...
Page 83: ...6 7...
Page 84: ...6 8...
Page 86: ...5 12 12 12 12 8 15 18 19 6 15 20 13 1 3 21 8 9 6 10...
Page 88: ......
Page 92: ......
Page 115: ...1 HHGLQJ HG VVHPEO 10 7...
Page 122: ...C 260NC C 320GNC C 325NC 10 14...
Page 123: ...10 15 Front Top Clamp...
Page 125: ...10 17 Rear Top Clamp...
Page 128: ......
Page 130: ......
Page 131: ......