background image

5.  INSTALLATION

CTR 500 TT is a complete machine, ready for connection. All components required for opera-

tion are integrated and internally connected.

The local regulations for electrical installations must be followed.

Planning and design of a dehumidifying system covers:
 

-   the dehumidifier’s position and connections

 

-   the shape of the duct system

 

-   distribution of the correct air volumes

 

-    the hygrostat’s position and connection. This is described more in the next section.

a) Location of CTR 500TT

The dehumidifier must be placed in the crawl space so that the following requirements and 

demands are satisfied:
 

-    effective distribution of the dry air with as simple a dry air duct system as possible

 

-   simple duct routing for supply of dry air and removal of wet air

 

-   simple electrical connection

 

-   space and access for easy filter changes

The dehumidifier is installed in the area to be dehumidified. 

It is ideally positioned near a wall 

on a bracket or shelf so that the filter is easy to access for replacement.

b) Duct system

Inward process air can be ducted or work with free suction. Dry air should be ducted. 

Wet air 

must be ducted so that the moisture laden wet air is vented outside the dehumidified area. 

Always use 

Corroventa´s installation kit

 to achieve best function.

Wet air

In certain cases, condensation can occur in the wet air hose. To avoid this, the hose must be laid 

with a fall from the machine. If a fall cannot be achieved directly from the machine one should 

make a drainage hole in the lowest part of the hose, to prevent water running back into the 

dehumidifier. 

To further prevent condensation, the insulated sound damping hose provided in 

the “installation kit” must be used.

- 6 -

Summary of Contents for CTR 500TT

Page 1: ...ss Contact person Tel no 201711 Technology and products for remediation of radon moisture and odours TECHNICAL DESCRIPTION DEHUMIDIFIERS FOR CRAWLSPACES CTR 500TT Developed and manufactured by Corrove...

Page 2: ...ifier CTR 500TT a Function b Construction external c Construction internal d Control panel 4 Technical data for dehumidifier CTR 500TT 5 Installation a Location of CTR 500TT b Duct system c Connection...

Page 3: ...ode at 60 RH At 70 RH there is a risk of moulding A rule of thumb is that 50 RH is a good climate for most materials But in the North it is rarely 50 RH In most places in the Nordic countries the aver...

Page 4: ...s desiccant with a total drying aera of approx 600 000 m2 The dehumidifier is used to dry atmospheric air using the adsorption principle The adsorption rotor The rotor has axially directed air ducts a...

Page 5: ...rthed plug for connection to an earthed 220 V socket 1 phase alternating current 50Hz Hygrostat socket that fits Corroventa s own control panel Run time meter that registers the time when the dehumidi...

Page 6: ...ack 6 Drying rotor with hub bearing spokes and blades 7 Drive motor with pulley for drive belt 8 Toothed drive belt 9 Rotor seal that forces air to pass through the drying rotor 10 Process air fan The...

Page 7: ...ad in the crawl space is too great a red lamp lights A green lamp also lights as long as the ventilation in the crawl space is functioning If the ventilation does not function because the fan does not...

Page 8: ...oval of wet air simple electrical connection space and access for easy filter changes The dehumidifier is installed in the area to be dehumidified It is ideally positioned near a wall on a bracket or...

Page 9: ...indicator box The indicator box must be placed in a suitable location in the house where it can be easily monitored To avoid unnecessary electrical routing it should be as close to the dehumidifier hy...

Page 10: ...panel to light Allow the machine to cool and pull the electrical plug out of the socket If the machine has stopped because of a dirty filter it will run again after replacing the filter once the plug...

Page 11: ...Install the hygrostat section with connection box 6 Route the according to point 2 above disconnected cable up through the drilled hole to the upper floor 7 Screw the indicator box into place at a sui...

Page 12: ...Technology and products for remediation of radon moisture and odours CORROVENTA AVFUKTNING AB Mekanikerv gen 3 SE 564 35 Bankeryd Tel 46 0 36 37 12 00 mail corroventa se www corroventa se...

Reviews: