background image

SCRN-530 Hardware Installation Guide | DOC-SCRN-530-HIG | 21 July, 2021 | Page 19

14. Disabling the LED Display

Step 1

From the CLI Configuration Mode, issue the 

set System RadioNode LED 

DefaultMode Dark

 command to disable the LED display:

%set System RadioNode LED DefaultMode Dark

Step 2

Issue the 

show System RadioNode LED

 command to verify the 

configuration:

%show System RadioNode LED

DefaultMode Dark;

15. Re-Enabling the LED Display

Step 1

From the CLI Configuration Mode, issue the 

set System RadioNode LED 

DefaultMode Standard

 command to re-enable the LED display:

%set System RadioNode LED DefaultMode Standard

Step 2

Issue the 

show System RadioNode LED

 command to verify the 

configuration:

%show System RadioNode LED

DefaultMode Standard;

Table 5  SCRN-530 LED Behavior

LED

Status

Flash Rate

Green: slow flashing The radio node or radio is 

administratively disabled

Approximately ½ second on, 

1½ sec. off

Green: fast flashing

Syncing

Approximately 1.4 second on/

off cycle

Green: solid

Operational

Red: solid

Fault

Blue: fast flashing

Locate radio node enabled (

Note

) Approximately 1 second on/

off cycle

Off

Powered off or LED disabled

Note:

 Refer to the 

Corning SCOS Administrator Guide

 for information about the locate 

radio node feature.

Summary of Contents for SCRN-530

Page 1: ...1 Small Cell Radio Node SCRN 530 Hardware Installation Guide DOC SCRN 530 HIG Issue 1 Related Literature Search www Corning com opcomm Click Required Resources Table 1 Revision History Issue Date Summ...

Page 2: ...Micro USB Port 8 5 4 Status LED 8 Section 6 System Specifications 9 Section 7 Compliance 10 Section 8 Mounting the SCRN 530 11 8 1 Installing the SCRN 530 on a Ceiling 11 8 2 Installing the SCRN 530 o...

Page 3: ...A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment...

Page 4: ...nd internal components Ensure that the SCRN 530 and associated antenna equipment is installed and serviced according to national and local ESD standards CAUTION Do not open the SCRN 530 casing E RAN w...

Page 5: ...aration powering and experience in hardware installation and maintenance 2 Product Overview The SCRN 530 is a 5G mmWave Time Division Duplexing TDD radio node that supports 2 x 2 MIMO small cell opera...

Page 6: ...dio Node Model Table 1 includes the SCRN 530 model configuration Table 1 Radio Node Configuration Radio Node Model Description Antenna Type SCRN 530 39 39 GHz band n260 mmWave RN with 8 x 8 dual polar...

Page 7: ...30 Hardware Installation Guide DOC SCRN 530 HIG 21 July 2021 Page 7 4 SCRN 530 Views Figure 2 and Figure 3 display views of the SCRN 530 Figure 2 SCRN 530 Cover Figure 3 SCRN 530 With Ceiling Mount Br...

Page 8: ...work interface module The hot pluggable SFP supplied with this SCRN 530 must be installed in the Transceiver Port The LC connector terminated end of the fiber pair of an ActiFi cable or other approved...

Page 9: ...pport per UE Dimensions 279 4 x 279 4 x 80 3 mm 11 0 x 11 0 x 3 16 in Weight 4 5 kg 9 9 lbs Input Power 1 x 48 VDC Phoenix deliverable using Corning ActiFi 2 fiber 2 copper conductor composite cable P...

Page 10: ...ed Unit X 509 certificate based authentication Environmental Requirements Operating temperature range 0 to 45 C 32 to 113 F Non operating temperature range 40 to 70 C 40 to 158 F Relative humidity Ope...

Page 11: ...izes RF leakage outside the building When mounting near a wall or other obstruction orient the mounting bracket so that the top of the radio node faces towards the coverage area and faces away from th...

Page 12: ...ted but if they do loosen them slightly to be able to slide the ceiling mount bracket on and off Step 3 Secure the ceiling tethering system Make sure that it can support the weight of the radio node a...

Page 13: ...ing Mount Bracket 8 2 Installing the SCRN 530 on a Wall The SCRN 530 comes with the ceiling mount bracket attached and has the multi angle wall mount bracket loose in the box Figure 8 shows the radio...

Page 14: ...rit level use the wall mount bracket as a template to mark securing hole locations Step 2 If required install sheet rock plugs Step 3 Attach the wall mount bracket to the wall Figure 8 shows the radio...

Page 15: ...Cabling Guidelines Incorrectly cabling the SCRN 530 can result in crushed cables and loss of communications to the radio node Follow these guidelines when cabling the SCRN 530 Make sure that the cabl...

Page 16: ...e brackets and cable connectors Step 4 Loosen the captive securing screw and slide out the bracket from the radio node 12 SCRN 530 LED Boot Sequence The radio node state machine is sequential and prog...

Page 17: ...state should be very short lived and should transition to the next state immediately A radio node should not stay in this state indefinitely Note Flashing Green is also used to indicate a radio node t...

Page 18: ...k firewall between radio node and centralized unit 5 Operating System Booting SolidGreen for a few seconds off for about 30 seconds then Solid Green The radio node loads the operating system and start...

Page 19: ...ode Standard command to re enable the LED display set System RadioNode LED DefaultMode Standard Step 2 Issue the show System RadioNode LED command to verify the configuration show System RadioNode LED...

Page 20: ...attended Corning Small Cell training in the past two years Email onesupport corning com to request a login if you meet these criteria Corning Optical Communications LLC 4200 Corning Place Charlotte NC...

Reviews: