SCRN-530 Hardware Installation Guide | DOC-SCRN-530-HIG | 21 July, 2021 | Page 16
10. Completing the Installation
Step 1
Make sure that the captive securing screws are tightened. The radio
node is now anchored.
Step 2
When it receives power, the radio node boots up and attempts to
connect to the centralized unit.
11. Detaching the SCRN-530 from the Mounting
Brackets
Step 1
Loosen the captive securing screw on the left side of wall mount
bracket.
Step 2
Pull the plunger pin on the right side of the wall mount bracket and by
pulling up take out the radio node from the wall mount bracket.
Step 3
Detach the cables from the cable brackets and cable connectors.
Step 4
Loosen the captive securing screw and slide out the bracket from the
radio node.
12. SCRN-530 LED Boot Sequence
The radio node state machine is sequential and progresses in the following order:
State 0 -> State 1 -> State 2 -> State 3 -> State 4 -> State 5 -> State 6
A normal boot sequence transitions through all these states sequentially and the LED
state transitions accordingly. If the radio node fails to transition to the next state, the
system restarts the boot sequence, starting with State 0. You can determine the
progress during the booting stages by observing the LED color transitions. When the
boot sequence completes, all devices are reachable.
On failure, the LED state display the state that encountered the failure.
Table 4
shows
the SCRN
-
530 boot sequence and corresponding LED behavior.