
Installation Manual | CMA-794-AEN | Page 40
Figure 76.
Push E62-N2RU Up
3. Push the E62-N2RU upward to interlace
with the hook at the Bracket II.
Figure 77.
Tighten the Screws
4. Tighten the M3 x 3 screws.
To Perform Maintenance on the E62-N2RU
Figure 78.
Unlock Rotary Hook Diagram 1
1. Depress the hook on the front of the E62-
N2RU to expose the top panel of E62-
N2RU for debugging and maintenance.