
Installation Manual | CMA-794-AEN | Page 25
Figure 39.
Placing Bracket I & IV
2. Place the Mounting Bracket I & IV onto the
surface where the E62-N2RU will be
attached to the reverse of the Ceiling Tiles.
Figure 40.
Placing Bracket 2
3. Ensure the nylon tie hangs down through
the hole.
Assemble Bracket II
Figure 41.
Assemble Bracket II
1. Attach Mounting Bracket II to Mounting
Bracket I using 2 x M6 x 70 screws, Flat
Washer M6, and Spring Washer M6.
Note: Paired Mounting Bracket III is already
assembled into E62-N2RU in factory