User Manual v1.0
Corning Restricted and Confidential Proprietary - Controlled content
BWS Draft2 LPR UM - 29-DEC-2019| September 2019
|Page 28 of 29
4.4.4
Verify Normal Operation
Verify the status LED blinking in green.
Verify CPRI link behaviour:
•
If there is a CPRI link – the green LED above the SFP will light.
•
If the optical cable is connected but the CPRI link was not established yet – the green and the amber
LEDs will light together.