User Manual v1.0
Corning Restricted and Confidential Proprietary - Controlled content
BWS Draft2 LPR UM - 29-DEC-2019| September 2019
|Page 15 of 29
Two basic management states are distinguished:
•
Connectivity updates:
includes first time deployment and provisioning, connectivity changes. For these
use cases, the BBU calculates and distributes system schemes and maps to the connected DRUs.
The first time provisioning includes:
1. Entering the BBU data into:
a. The provider’s network
b. The BBU itself (via SCPS application)
2. The BBU initiates an identification procedure of its MAC address.
As a result, the BBU and the network “know” how to communicate.
•
On-going updates
: includes SW management, parameter settings, alarm monitoring etc. These actions
are performed via the DRU.
Note: the system management has a single user, of type Admin. Only one management session
may be active at a time.
The following figure shows the system management points.
1.3.4
System Deployment: Building map and Scheme
After a system is installed, it needs to calculate and to map the building, the deployed LPRs, and the and its
units