background image

7

189159001

B.

Place ice bank control sensing bulb in product coils basket holder. BE CAREFUL NOT TO KINK CAP-
ILLARY TUBE. COIL EXCESS TUBE AND PLACE IN A SAFE AREA.

C.

Install new ANODE (item 2) in product coil basket holder.

D.

Connect anode wire to evaporator tank using aluminum SHEET METAL SCREW (item 3).

E.

Install dispensing valves, plate gasket, and plate on unit and secure with shank nuts.

F.

Connect product lines to back of dispensing valve sleeves.

G.

Make sure rubber washers are in place on tank coil line fittings.

H.

Remove water fill plug from water fill hole in agitator motor and cover assembly.

I.

Using hack saw (see Figure 1), cut out corner of cover assembly water fill hole enough to fit over lines
connected to new copper evaporator coil.

J.

Very carefully, place agitator motor and cover assembly in unit. Secure cover assembly in unit with
screws.

K.

Secure product coil line fittings to cover assembly with hex nuts.

L.

Connect agitator motor ground wire and power cord.

M.

Connect product inlet line swivel nut connectors to product coil line fittings on cover assembly.

IMPORTANT: Install RUBATEX INSULATION (item 7) on copper tubing as follows:

A. Cut rubatex insulation to length for length of tubing to be insulated.

B. Remove paperback from cut piece of insulation.

C. Lay insulation length wise along copper tubing, then wrap insulation on tubing.

6. Using RUBATEX INSULATION (item 7), wrap accumulator from insulating tubing on bottom of accumulator

to solder connection on compressor. MAKE SURE REFRIGERATION PLUMBING AND ITS COM-
PONENTS DO NOT INTERFERE WITH CONDENSER FAN.

7. Using RUBATEX INSULATION (item 7), wrap suction line assembly tubes where they enter evaporator

tank.

8. Fill water tank with clean water to top of stainless steel coils located in coil basket. USE 

LOW-MINERAL-CONTENT WATER WHERE A LOCAL WATER PROBLEM EXISTS.

9. Install unit top cover and secure with four screws.

10. Install lower access grilles on unit.

11. Install unit drip tray.

TESTING

Test run unit to ensure it builds an ice bank (43 lbs.) and shuts off.

Summary of Contents for Universal 750 Pre-Mix

Page 1: ...hese instructions as part of your equipment manual UNPACKING THE KIT Unpack and inspect the kit Make sure Loose Shipped Parts are present and in good condition see Figure 1 Table 1 Loose Shipped Parts...

Page 2: ...eter 0 300 VAC To measure line voltage 9 Ohmmeter 0 10 and 100 000 ohms To check resis tance of electrical circuitry 10 Leak detector capable of detecting at least 1 2 ounce year To detect refriger an...

Page 3: ...nd lay them off to one side 7 Unit with sealed evaporator tank A Very carefully lift product coil basket up out of evaporator tank and lay them off to one side IMPORTANT If evaporator tank has hole in...

Page 4: ...ATOR TANK ONLY COVER RETAINING SCREW 8 CUT OUT WITH HACK SAW PLATE GASKET SUCTION LINE ASSEMBLY ITEM 1 INSTALLATION POSITION SCREW 4 ITEM 6 SIDE PANEL RETAINING SCREW 4 ACCESS GRILLE RETAINING SCREW 4...

Page 5: ...ide lower part of unit Pinch off or plug tubes 5 Remove old suction line assembly including accumulator and old dual inlet strainer dryer from inside unit 6 Very carefully see Figure 1 bend SUCTION LI...

Page 6: ...ation system with 10 ounces of clean dry R 12 refrigerant ASSEMBLY 1 Push corner of unit side and front panel together 2 Install THREAD ROLLING SCREWS item 6 in first four holes top to bottom to secur...

Page 7: ...hex nuts L Connect agitator motor ground wire and power cord M Connect product inlet line swivel nut connectors to product coil line fittings on cover assembly IMPORTANT Install RUBATEX INSULATION it...

Page 8: ......

Reviews: