![Cornelius FCB Pinnacle 2 Flavor Installation Manual Download Page 9](http://html1.mh-extra.com/html/cornelius/fcb-pinnacle-2-flavor/fcb-pinnacle-2-flavor_installation-manual_2668289009.webp)
FCB Pinnacle 2 and 4 Flavor Installation Manual
© 2003-2014, Cornelius Inc.
- 7 -
Publication Number: 560007295INS
NOTE: In most applications, setting the CO
2
regulator between 26-28 psi will result in undesirable,
excessive overrun.
4.
Bleed the air from both the Blendonator relief valves and the face plate relief valves for 30 seconds each.
Figure 5.
5.
Check for gas leaks by turning off the CO
2
cylinder or bulk CO
2
tank valve. Wait at least 3 minutes and
check the CO
2
cylinder gauge to see if the pressure has dropped.
Pressurizing Syrup System
1.
Adjust the CO
2
regulator for the syrup BIB pumps, so there is 60 psi syrup pressure at the unit.
2.
Check for syrup leaks.
3.
The syrup error on the display will automatically reset itself.
Fill Water Bath
NOTE: Filling both water baths at once, on the 4 Flavor unit, may cause a H
2
O Error.
1.
Make sure the Water Bath Drain Line is plugged.
2.
Turn ON the water supply to the unit.
3.
Remove the top cover and open the water bath fill valve (Figure 6.) and fill the water bath just to the top of
the product cooling coils (Figure 7.)
Freeze
Cylinder
Shut
‐
off
Valves(X4)
Closed
Position
Shown
Face
Plate
Relief
Valves
(X4)
Blendonator
CO
2
Regulator
(X4)
Summary of Contents for FCB Pinnacle 2 Flavor
Page 23: ......