FCB Pinnacle 2 and 4 Flavor Installation Manual
Publication Number: 560007295INS
- 8 -
© 2003-2014, Cornelius Inc.
NOTE: If ice bath overfills, water will run out the overflow tube in the front of the unit.
4.
Replace the top cover.
Power Unit ON
1.
Make sure the freeze cylinder shutoff valves are OFF (valve handles perpendicular to valve body, see
Figure 5.)
2.
Turn the power to the unit ON. Watch for the “Initializing - Please Standby” message, displayed for 3-5 sec-
onds. Check to see if there are CO
2
, water, or syrup error messages.
3.
Install back access panel and side panels. Push the unit into place.
4.
Ice bank refrigeration will start.
5.
Turn on the Blendonators by going into menu 14 and turning both to ON.
6.
The product delivery pumps will now turn on and fill the Blendonator tanks. Continue by Brixing the unit.
Figure 6.
Figure 7.
Figure 8.
Blendonator
Relief
Valve Water
Bath
Fill
Valve
Top
of
Product
Cooling
Coils
BRIX Sample
Valves