©
2017, Cornelius Inc.
- 8 -
Installation steps
Installation of coffee tower and taps
1.
Make an opening in suitable position on the desktop as needed. To avoid the structure
interference between tower and nitrogen infusion unit, the distance between this opening and
near-edge of desktop should be 38 cm at least.
2.
Install coffee tower vertically inside the opening and fix the part under counter using screws.
Installation of
nitrogen infusion unit
1.
Filling of Ice-bank: pull the overflow tray at the bottom of device until the interior is seen. Open
the red cap of water tank on the left side of the device, and fill water slowly into the water tank
(about 14L) until overflow water could be observed in the overflow tray, and then put the top cover
back.
2.
Connect the strainer to the coffee machine: Assemble the coffee strainer as shown below. Make right
direction of the check valve as below picture. The length of the tube tygon can be determined according
to installation. Connect the “a” and “b” of the strainer to the coffee machine as above graphic. After the
coffee machine is placed suitable position and then fix the strainer under the table.
Summary of Contents for Cascata180
Page 18: ... 2017 Cornelius Inc 17 ...
Page 19: ... 2017 Cornelius Inc 18 ...
Page 20: ...Cornelius Tianjin Co Ltd www cornelius com cn ...