Coffee quick connectors (black, 3 pin) Nitrogen quick connectors (white, 2 pin)
Device commissioning
1.
Pressurization
: after confirming that the above installation steps have been completed, check and
ensure that all pipes have been connected and secured with clamps, close the taps, and open the
main valve on nitrogen cylinder gradually; keep a close eye on the system in boosting process to
identify leakage of coffee and other defects, and in case of emergency, shut down the main valve
on nitrogen cylinder.
2.
Power on
: after making sure that everything is OK, insert power plug into socket and turn on the
main power switches on the device.
3.
Check if the
inlet pressure
on body is 40~70psi (60 psi is recommended).
4.
Test pouring of coffee:
after powering up and cooling for 1 hour, adjust the
nitrogen regulator
valve
(behind the door) according to the desired result of the coffee to regulate the foam effect:
turn the regulating valve clockwise until it is closed, and then turn it
for about 1.2
digit
counterclockwise starting from the closed position.
Hold the device for 1 minute and make test
pouring. To get more foam, tune the knob finely counterclockwise; to get less foam, turn the knob
clockwise. The effect of adjustment is not visible until after 2~3 cups of coffee is dispensed. (It is
not needed to reset the regulator valve during routine replacement of coffee keg.)
Warning
-please make sure that the machine's power supply has been disconnected before
installation.
Warning
-pipe joints, clamps and threads must be properly installed; otherwise, leakage of water
or nitrogen may occur during use.
Attention
-the device should be installed in the area where it is used and where the trained
professional service personnel have easy access to it.
Operation