2)
Refer to Illustration 4.2.
Assemble the post using bolts 1/2" X
3" X #13 (12,7 mm X 76,2 mm) (U), nuts (UU) and washers (V).
Remember to insert a spacer (T) and two washers (V) inside the
beam aligned to each bolt.
3)
Refer to Illustration 4.3.
Cover the bolt heads with bolt caps
(W) and insert the styrofoam caps (X) at both ends of foot beam.
SRTAIGHT SECTION BUTTRESS ASSEMBLY (continued)
4
1/
2
” BOLT CAP COVER
STYROFOAM CAP
BUTTRESS POST
Illustration 4.3
Illustration 4.2
1)
Position the buttress pillars assembled in Step 4 on the patio
blocks in the trenches previously dug.
2)
Refer to Illustration 5.1 :
Once the buttress pillars are placed
in the trenches, assemble the straight section bottom tracks (J) be-
tween the pillars on the foot beams.
3)
Refer to Illustration 5.2 :
Fix the pressure plates between
BOTTOM TRACKS (STRAIGHT) AND PRESSURE PLATES
5
B
O
TT
OM
T
R
A
C
K
S
T
R
AI
G
HT
S
E
C
TI
O
N
S
TAN
D
A
RD
S
C
R
EW #
1
4
PR
E
SS
U
R
E
P
LATE
Illustration 5.2
Illustration 5.1