CopperOptics 150-1318-01 Manual Download Page 8

Section 363-718-100
Revision 01

Page 8

TABLE 9  COT SHELF CONNECTIONS  SYSTEM 2

Channe

l

Connector

P2

Connector

P4

Unit

Circuit

Ring

Tip

Ring

Tip

7

1

26

1

2

27

2

3

28

3

4

29

4

5

26

1

6

27

2

7

28

3

8

29

4

8

1

30

5

2

31

6

3

32

7

4

33

8

5

30

5

6

31

6

7

32

7

8

33

8

9

1

34

9

2

35

10

3

36

11

4

37

12

5

34

9

6

35

10

7

36

11

8

37

12

Table continued on next column

TABLE 9  (CONTINUED)

Channe

l

Connector

P2

Connector

P4

Unit

Circuit

Ring

Tip

Ring

Tip

10

1

38

13

2

39

14

3

40

15

4

41

16

5

38

13

6

39

14

7

40

15

8

41

16

11

1

42

17

2

43

18

3

44

19

4

45

20

5

42

17

6

43

18

7

44

19

8

45

20

12

1

46

21

2

47

22

3

48

23

4

49

24

5

46

21

6

47

22

7

48

23

8

49

24

Bypass

#2

50

25

Note:   Shaded terminations are used only with 8
Channel POTS and DDS Units.

Summary of Contents for 150-1318-01

Page 1: ...STALLATION AND TEST 7 UNPACKING 10 8 PRE PROVISIONING HDSL LINES 10 9 INSTALLATION REQUIREMENTS 11 10 MOUNTING 11 11 WIRING 11 12 TURN UP AND TESTING 11 13 TROUBLESHOOTING 11 CAUTION This product inco...

Page 2: ...C rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate...

Page 3: ...owered from 48 V dc CO battery 6 BACKPLANE CONNECTIONS 6 01 The backplane of the FCS 718 COT Shelf Figure 2 contains the following connectors CO Power Table 1 Local Area Network Table 2 Data Table 3 H...

Page 4: ...5 mm Wire Wrap Tip and ring terminations for HDSL Pair 1 of System 2 to Remote Terminal 2 130 V dc is simplexed on this line for powering the Remote Terminal B_HDSL_T2 B_HDSL_R2 0 45 mm Wire Wrap Tip...

Page 5: ...e jumpered to the BYPASS pair from RT 1 B_TEST_IN_T B_TEST_IN_R 0 45 mm Wire Wrap Test connection looking into the COT channel unit for the selected subscriber for System 2 This connection must be set...

Page 6: ...na Termina Ckt 7Ckt 7Ckt 7Ckt 7Ckt 7Ckt 7 Termina Ckt 7Ckt 7Ckt 7Ckt 7Ckt 7 Ckt 7 tion tion Ckt 8Ckt 8Ckt 8Ckt 8Ckt 8Ckt 8 tion Ckt 8Ckt 8Ckt 8Ckt 8Ckt 8 Ckt 8 Notes 1 Each PG Flex channel unit provid...

Page 7: ...1 9 34 2 10 35 3 11 36 4 12 37 5 34 9 6 35 10 7 36 11 8 37 12 Table continued on next column TABLE 8 CONTINUED Channe l Connector P1 Connector P3 Unit Circuit Ring Tip Ring Tip 4 1 38 13 2 39 14 3 40...

Page 8: ...34 9 2 35 10 3 36 11 4 37 12 5 34 9 6 35 10 7 36 11 8 37 12 Table continued on next column TABLE 9 CONTINUED Channe l Connector P2 Connector P4 Unit Circuit Ring Tip Ring Tip 10 1 38 13 2 39 14 3 40 1...

Page 9: ...4 29 Tip 4 5 Sleeve 2 30 Sleeve 1 6 Sleeve 4 31 Sleeve 3 7 OH 2 32 OH 1 8 OH 4 33 OH 3 9 Proceed 2 34 Proceed 1 10 Proceed 4 35 Proceed 3 11 Lock 2 36 Lock 1 12 Lock 4 37 Lock 3 13 38 14 39 15 40 16 4...

Page 10: ...talk should be kept to a minimum Pair isolation tip ring tip ground and ring ground must be 100 kohms 8 02 The wire pairs from the COT to the RT must meet the following design guidelines Nonloaded cab...

Page 11: ...of the frame Note If the COT is to support two systems on a single shelf then a second set of HDSL leads must be provided one set to each RT 6 Subscriber Lines Two 25 pair Amphenol ended female cables...

Page 12: ...nate HDSL Pair 1 onto wire wrap pins A_HDSL_T1 Tip and A_HDSL_R1 Ring on the COT shelf b Terminate HDSL Pair 2 onto wire wrap pins A_HDSL_T2 Tip and A_HDSL_R2 Ring on the COT shelf Note The following...

Page 13: ...he 48 V dc and GND screw terminals on the COT shelf b Visually verify the HDSL lines are terminated properly and with the correct orientation Note If the HDSL lines are not connected properly the COT...