CopperOptics 150-1318-01 Manual Download Page 6

Section 363-718-100
Revision 01

Page 6

TABLE 6  COT SHELF CIRCUIT ASSIGNMENTS

Alarm Unit Line Unit 1 CU 1CU 2CU 3CU 4CU 5CU 6 Line Unit 2 CU 7CU 8CU 9 CU

10

CU

11

CU 12

Refer

Refer

Ckt 1Ckt 1Ckt 1Ckt 1Ckt 1Ckt 1

Refer

Ckt 1Ckt 1Ckt 1Ckt 1Ckt 1

Ckt 1

to

to

Ckt 2Ckt 2Ckt 2Ckt 2Ckt 2Ckt 2

to

Ckt 2Ckt 2Ckt 2Ckt 2Ckt 2

Ckt 2

Table 5

Table 4 Ckt 3Ckt 3Ckt 3Ckt 3Ckt 3Ckt 3 Table 4 Ckt 3Ckt 3Ckt 3Ckt 3Ckt 3

Ckt 3

for

for

Ckt 4Ckt 4Ckt 4Ckt 4Ckt 4Ckt 4

for

Ckt 4Ckt 4Ckt 4Ckt 4Ckt 4

Ckt 4

Alarm

Line

Ckt 5Ckt 5Ckt 5Ckt 5Ckt 5Ckt 5

Line

Ckt 5Ckt 5Ckt 5Ckt 5Ckt 5

Ckt 5

Unit

Unit

Ckt 6Ckt 6Ckt 6Ckt 6Ckt 6Ckt 6

Unit

Ckt 6Ckt 6Ckt 6Ckt 6Ckt 6

Ckt 6

Termina

Termina Ckt 7Ckt 7Ckt 7Ckt 7Ckt 7Ckt 7 Termina Ckt 7Ckt 7Ckt 7Ckt 7Ckt 7

Ckt 7

tion

tion

Ckt 8Ckt 8Ckt 8Ckt 8Ckt 8Ckt 8

tion

Ckt 8Ckt 8Ckt 8Ckt 8Ckt 8

Ckt 8

Notes: 1.

Each PG-Flex channel unit provides four (4) or eight (8) circuits, depending on the service offering
(i.e. POTS, ISDN, DDS, etc.) of the channel unit – refer to Table 7.

2.

For channel units providing four (4) circuits, circuits Ckt 1 through Ckt 4 are used for tip and ring

terminations.  For channel units providing eight (8) circuits, circuits Ckt 1 through Ckt 8
are used for tip and ring terminations.

3.

For a 24-channel system, a maximum of 24 circuits may be provisioned.

TABLE 7  CHANNEL UNIT CIRCUIT UTILIZATION

Channel

Channel Unit Service Configurations

Unit

4-Ch. POTS

8-Ch. POTS

4-Ch. ISDN

4-Ch. DDS

Ckt 1

l

l

l

l

Ckt 2

l

l

l

l

Ckt 3

l

l

l

l

Ckt 4

l

l

l

l

Ckt 5

l

l

Ckt 6

l

l

Ckt 7

l

l

Ckt 8

l

l

Summary of Contents for 150-1318-01

Page 1: ...STALLATION AND TEST 7 UNPACKING 10 8 PRE PROVISIONING HDSL LINES 10 9 INSTALLATION REQUIREMENTS 11 10 MOUNTING 11 11 WIRING 11 12 TURN UP AND TESTING 11 13 TROUBLESHOOTING 11 CAUTION This product inco...

Page 2: ...C rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate...

Page 3: ...owered from 48 V dc CO battery 6 BACKPLANE CONNECTIONS 6 01 The backplane of the FCS 718 COT Shelf Figure 2 contains the following connectors CO Power Table 1 Local Area Network Table 2 Data Table 3 H...

Page 4: ...5 mm Wire Wrap Tip and ring terminations for HDSL Pair 1 of System 2 to Remote Terminal 2 130 V dc is simplexed on this line for powering the Remote Terminal B_HDSL_T2 B_HDSL_R2 0 45 mm Wire Wrap Tip...

Page 5: ...e jumpered to the BYPASS pair from RT 1 B_TEST_IN_T B_TEST_IN_R 0 45 mm Wire Wrap Test connection looking into the COT channel unit for the selected subscriber for System 2 This connection must be set...

Page 6: ...na Termina Ckt 7Ckt 7Ckt 7Ckt 7Ckt 7Ckt 7 Termina Ckt 7Ckt 7Ckt 7Ckt 7Ckt 7 Ckt 7 tion tion Ckt 8Ckt 8Ckt 8Ckt 8Ckt 8Ckt 8 tion Ckt 8Ckt 8Ckt 8Ckt 8Ckt 8 Ckt 8 Notes 1 Each PG Flex channel unit provid...

Page 7: ...1 9 34 2 10 35 3 11 36 4 12 37 5 34 9 6 35 10 7 36 11 8 37 12 Table continued on next column TABLE 8 CONTINUED Channe l Connector P1 Connector P3 Unit Circuit Ring Tip Ring Tip 4 1 38 13 2 39 14 3 40...

Page 8: ...34 9 2 35 10 3 36 11 4 37 12 5 34 9 6 35 10 7 36 11 8 37 12 Table continued on next column TABLE 9 CONTINUED Channe l Connector P2 Connector P4 Unit Circuit Ring Tip Ring Tip 10 1 38 13 2 39 14 3 40 1...

Page 9: ...4 29 Tip 4 5 Sleeve 2 30 Sleeve 1 6 Sleeve 4 31 Sleeve 3 7 OH 2 32 OH 1 8 OH 4 33 OH 3 9 Proceed 2 34 Proceed 1 10 Proceed 4 35 Proceed 3 11 Lock 2 36 Lock 1 12 Lock 4 37 Lock 3 13 38 14 39 15 40 16 4...

Page 10: ...talk should be kept to a minimum Pair isolation tip ring tip ground and ring ground must be 100 kohms 8 02 The wire pairs from the COT to the RT must meet the following design guidelines Nonloaded cab...

Page 11: ...of the frame Note If the COT is to support two systems on a single shelf then a second set of HDSL leads must be provided one set to each RT 6 Subscriber Lines Two 25 pair Amphenol ended female cables...

Page 12: ...nate HDSL Pair 1 onto wire wrap pins A_HDSL_T1 Tip and A_HDSL_R1 Ring on the COT shelf b Terminate HDSL Pair 2 onto wire wrap pins A_HDSL_T2 Tip and A_HDSL_R2 Ring on the COT shelf Note The following...

Page 13: ...he 48 V dc and GND screw terminals on the COT shelf b Visually verify the HDSL lines are terminated properly and with the correct orientation Note If the HDSL lines are not connected properly the COT...

Reviews: