
Rooftop Packaged Service Manual MAINTENANCE
89
4. Cut off the
connection between
compressor and
pipes.
Heat the connection pipes indicated
by arrows with fired heater and then
draw out them.
Note:
Pay attention to things around to
avoid burning out.
5. Take down the
compressor from the
base.
Unscrew the nuts on compressor
base with a wrench and then remove
compressor from the base.
Note:
Keep compressor level and
vertically out. Never invert it.
6. Fix the compressor
on to the base.
Put the repaired or new compressor
on base as the direction during
removing,and then screw down fixing
nut on compressor base with a
wrench.
Note:
Keep compressor level and
vertically on to the base. Never incline or
invert it.
7. Connect
compressor with
system pipes.
Heat the connection pipes indicated
by arrows and then weld them with
unit pipes together.
Note:
Pay attention to things around to
avoid burning out.
Summary of Contents for CH-IRT05NM
Page 4: ...Rooftop Packaged Service Manual PRODUCT 1 PRODUCT ...
Page 10: ...Rooftop Packaged Service Manual CONTROL 7 CONTROL ...
Page 12: ...Rooftop Packaged Service Manual CONTROL 9 1 2 HEATING OPERATION ...
Page 36: ...Rooftop Packaged Service Manual INSTALLATION 33 INSTALLATION ...
Page 39: ...Rooftop Packaged Service Manual INSTALLATION 36 CH IRT08NM CH IRT15NM ...
Page 49: ...Rooftop Packaged Service Manual INSTALLATION 46 CH IRT15NM CH IRT15NM ...
Page 50: ...Rooftop Packaged Service Manual MAINTENANCE 47 MAINTENANCE ...
Page 110: ...Cooper Hunter International Corporation www cooperandhunter com ...