![Cool Compact 10x GN 1/1 User Manual Download Page 6](http://html1.mh-extra.com/html/cool-compact/10x-gn-1-1/10x-gn-1-1_user-manual_2660639006.webp)
6
The manufacturer rejects all responsibility in the event of improper use of the product.
The manufacturer also reserves the right to make any modifications to its products that deems to be
necessary or useful, without affecting the basic characteristics.
6. INSTALLATION
The installation, commissioning and maintenance of the blast chillers is only to be carried out by
refrigeration technicians and / or technically qualified personnel or personnel approved by the
manufacturer.
6.1. TRANSPORT AND HANDLING
For the correct transport and subsequent handling of the blast chillers, the following instructions
should be followed:
•
To avoid any damage to objects and persons, use appropriate means of transport and
equipment for transporting the unit.
•
For the use of appropriate means of transport, check the weight of the blast chiller.
•
Caution: NEVER turn the appliance upside down or lay it on its side when transporting. Doing
so could damage the unit and affect the functioning of the refrigeration circuit.
6.2. UNPACKING AND INSTALLING
Before installing, unpack the unit carefully.
•
Move the still packed blast chiller near the installation site using a lift truck.
•
Cut the straps and pull the cardboard packaging upwards. To avoid any damage to the
appliance, do not use knives or any similar devices.
•
Remove the blast chiller from the wooden pallet and place it in its final position.
•
Fit the enclosed retaining rails for the condensate tray and insert the enclosed condensate
tray. (See the assembly instructions for the condensate tray)
Condensate tray
Z-profile (2x)
Hexagon socket screw M4x10 (6x)