5
a.
Attach large dome to Tower base by aligning the center
hole around Tower base and snap the two ribs of Tower
base to the two slots of the large dome.
b.
Attach Small dome to Tower base by aligning the center
hole around Tower base and snap the two ribs of Tower
base to the two slots of the Small dome.
c.
Attach Top to Tower base by aligning the center hole
around Tower base and snap the two ribs of Top to the two
slots of the Tower base.
d.
Attach assembled Tower to Base by aligning the three holes
around the bottom of the Tower with the three pins in the
Bowl.
5.
Plug the power cord into a standard 220-240V AC electrical
outlet.
TO USE
1.
Place the Fountain on a flat, level, and stable surface. Unit
must be level to operate properly.
2.
Turn the Power Switch to "HEAT' to preheat the bowl.
NOTE: let the unit warm up for at least three minutes before
adding melted chocolate.
3.
Prepare Chocolate: